80Mb/s Events and 20Mb/s rejected
PreTriggerWindow 3360ns and PostTriggerWindow 640ns
axis 1: 13
axis 2: -4
40Mb/s Events and 4 Mb/s rejected
PreTriggerWindow: 1360ns and PostTriggerWindow: 640ns
16GB collected
PreTriggerWindow: 640ns and PostTriggerWindow: 3.36µs
25Mb/s Events and 25Mb/s rejected
RaMon Rate 1.4MHz
3360ns PreTriggerWindow and 640ns PostTriggerWindow
Had to restart eventbuilder at 19:39 due to high rejected rate
60Mb/s Events and 10-15Mb/s rejected
Threshold change from 50 to 500
10GB collected
new callibration was done, dimanond detector connected to readout
Threshold = 4000
thresholds were too low -> run was canceled
Run nr. 12 wasn't recorded.
new calib from this run on
RaMon Rate 1.5MHz
adjusted threshold for double-sided LGAD (accounted for polarity of signal)
Threshold set to 2000
50GB data collected
Room Entry Request: 18:21
Threshold set to 4000
40GB data collected
threshold = 2000
Threshold set to 3000
moved Ripple filters back in
100GB data collected
RaMon Rate 1.5 MHz
17:43: eventbuilder restart since lots of rejected triggers
PreTriggerWindow 640ns und PostTriggerWindow 85ns