Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 6 of 7  Not logged in ELOG logo
Entry  Thu Mar 13 16:36:43 2025, tb-crew, validating setup, 95, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:34:19, 13.03.2025 16:37:08, 2, HV, None,  tjmonopix2.conf
automatic log for run 95
Comment:
tests without beam 
Entry  Thu Mar 13 16:29:06 2025, tb-crew, validating setup, 94, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:27:33, 13.03.2025 16:29:31, 1, HV, None,  tjmonopix2.conf
automatic log for run 94
Comment:
tests without beam 
Entry  Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,  
RaMon Rate 600kHz

front sensors 200mu: ~1kHz pro Streifen

Comments:
Entry  Sat Mar 15 10:07:28 2025, RD50 Generic User, Alignment Run 252MeV, 4, Sandwich-iCT setup(GSI)+RaMon, 252.7 MeV, Low Flux Medium, Proton, Good, 10:07, 11:43, 96, , ,  
RaMon Rate 1MHz

front sensors 200mu: ~10-25kHz pro Streifen
Entry  Sun Jun 22 00:55:11 2025, Julia Müllner, 124.4 MeV mouse, 31, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:55, 01:04, 9, , ,  
axis 1: 9

axis 2: -4
Entry  Sun Jun 22 00:46:37 2025, Julia Müllner, 124.4 MeV mouse, 30, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:46, 0:54, 8, , ,  
axis 1: 9

axis 2: -1
Entry  Sun Jun 22 00:36:52 2025, Julia Müllner, 124.4 MeV mouse, 29, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:37, 0:45, 8, , ,  
axis 1: 9

axis 2: 2
Entry  Sun Jun 22 00:27:14 2025, Julia Müllner, 124.4 MeV mouse, 28, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:28, 0:36, 8, , ,  
axis 1: 9

axis 2: 5
Entry  Sun Jun 22 00:17:19 2025, Julia Müllner, 124.4 MeV mouse, 27, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:18, 0:26, 8, , ,  
axis 1: 9

axis 2: 8
Entry  Sun Jun 22 00:08:17 2025, Julia Müllner, 124.4 MeV mouse, 26, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, , 0:09, 0:17, 8, , ,  
axis 1: 9

axis 2: 11
Entry  Sun Jun 22 00:00:11 2025, Julia Müllner, 124.4 MeV mouse, 25, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 0:00, 0:08, 8, , ,  
axis 1: 9

axis 2: 14
Entry  Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,  
RaMon Rate 400kHz

front sensors 200mu: ~10-20kHz pro Streifen

Comments:
Entry  Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,  
RaMon Rate not measured

front sensors 200mu: ~40-60Hz pro Streifen

Comments:
Entry  Sun Jun 22 03:41:19 2025, Julia Müllner, 124.4 MeV mouse, 49, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 03:41, 03:51, 10, , ,  
axis 1: 5

axis 2: 2
Entry  Wed Mar 12 09:29:08 2025, tb-crew, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
1st test
Entry  Fri Mar 14 19:47:58 2025, mausi, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
system tests
Entry  Fri Mar 14 21:40:34 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
tracker test without beam
Entry  Fri Mar 14 21:53:59 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
starting beam
Entry  Fri Mar 14 21:54:32 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
about to get p+
Entry  Fri Mar 14 22:13:14 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
APV25 latency 42 required for these input stretches
ELOG V3.1.5-fc6679b