400.1MeV, Degrader 10
40Mb/s Events and 4 Mb/s rejected
PreTriggerWindow: 1360ns and PostTriggerWindow: 640ns
PreTriggerWindow: 640ns and PostTriggerWindow: 3.36µs
25Mb/s Events and 25Mb/s rejected
3360ns PreTriggerWindow and 640ns PostTriggerWindow
Had to restart eventbuilder at 19:39 due to high rejected rate
60Mb/s Events and 10-15Mb/s rejected
Run nr. 12 wasn't recorded.
new calib from this run on
adjusted threshold for double-sided LGAD (accounted for polarity of signal)
threshold = 2000
17:43: eventbuilder restart since lots of rejected triggers
PreTriggerWindow 640ns und PostTriggerWindow 85ns
Setup wurde verschoben: 5mm vorne nach links und hinten 4mm, in Beamrichtung
threshold = 4000
setup was moved, stopped to move setup again
interupted to get inside the room
just to check if the beam was there