Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 4 of 4  Not logged in ELOG logo
Entry  Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,  

RaMon Rate not measured

front sensors 200mu: ~40-60Hz pro Streifen

Comments:

stopped run due to too low rate

 

Entry  Sat Mar 15 10:07:28 2025, RD50 Generic User, Alignment Run 252MeV, 4, Sandwich-iCT setup(GSI)+RaMon, 252.7 MeV, Low Flux Medium, Proton, Good, 10:07, 11:43, 96, , ,  

RaMon Rate 1MHz

front sensors 200mu: ~10-25kHz pro Streifen

Entry  Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,  

RaMon Rate 600kHz

front sensors 200mu: ~1kHz pro Streifen

Comments:

change of the trigger settings inbetween, we saw inefficency on all detectors

Entry  Sat Mar 15 13:15:25 2025, RD50 Generic User, Slab Measurement 205MeV, 6, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 13:27, 14:49, 82, , ,  

RaMon Rate 1.3 MHz

Comments:

We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed.

Entry  Sat Mar 15 15:02:39 2025, RD50 Generic User, Rate testing, 7, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 15:04, 15:25, 21, , ,  

RaMon Rate 4.5MHz

Comments:

From File 7 until 21 optional false, and from 22 true (everything deleted)

Entry  Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm 

RaMon Rate: 1.3MHz

Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 

RaMon rate: 4.5MHz

Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 

totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
ab 52 wieder ohne best effort

600

Entry  Fri Mar 14 23:55:03 2025, elog-producer, 1st tests with beam, 210, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Crap, 14.03.2025 23:37:02, 14.03.2025 23:55:29, 18, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 210
Comment:
Entry  Sat Mar 15 04:11:28 2025, elog-producer, energy scans, 231, TJ-Monopix2, 83 MeV, Low Flux Very Low, Proton, Crap, 15.03.2025 04:00:20, 15.03.2025 04:11:54, 11, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 231
Comment:
Entry  Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,  

RaMon Rate: 1.3MHz

Comments:

Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey

Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 

RaMon Rate 1.5 MHz

Entry  Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm 

RaMon Rate 1.5MHz

Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 

RaMon Rate 1.4MHz

ELOG V3.1.5-fc6679b