Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 3 of 10  Not logged in ELOG logo
Entry  Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm 
RaMon Rate: 1.3MHz
Entry  Sat Mar 15 13:15:25 2025, RD50 Generic User, Slab Measurement 205MeV, 6, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 13:27, 14:49, 82, , ,  
RaMon Rate 1.3 MHz

Comments:

We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed.
Entry  Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,  
RaMon Rate 600kHz

front sensors 200mu: ~1kHz pro Streifen

Comments:
Entry  Sat Mar 15 15:02:39 2025, RD50 Generic User, Rate testing, 7, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 15:04, 15:25, 21, , ,  
RaMon Rate 4.5MHz

Comments:

From File 7 until 21 optional false, and from 22 true (everything deleted)
Entry  Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,  
RaMon Rate: 1.3MHz

Comments:

Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey
Entry  Sat Mar 15 01:05:30 2025, elog-producer, Fast RO Test, 213, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 00:50:36, 15.03.2025 01:05:56, 15, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 213
Comment:
Fast RO for Monopix:
Entry  Sat Mar 15 01:22:54 2025, elog-producer, Fast RO Test, 214, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 01:08:54, 15.03.2025 01:23:21, 14, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 214
Comment:
Fast RO for Monopix: Medium
Entry  Sat Mar 15 01:29:25 2025, elog-producer, Fast RO Test, 215, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 15.03.2025 01:26:13, 15.03.2025 01:29:51, 3, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 215
Comment:
Lower rates then Very low settings, so just a quick run here
Entry  Sat Mar 15 01:38:17 2025, elog-producer, Fast RO Test, 216, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,  
Fast RO for Monopix:
W02W01 8b10b error quite early
Entry  Sat Mar 15 01:51:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,  
Run 219, Medium settings, fast RO, W02R01 to 8b10b a few minutes in
Entry  Sat Mar 15 01:58:29 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,  
Run 220, 8b10b error
Entry  Sat Mar 15 02:15:34 2025, elog-producer, Fast RO Test, 221, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 15.03.2025 02:02:15, 15.03.2025 02:16:00, 13, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 221
Comment:
Entry  Sat Mar 15 02:34:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
Run 223, 8b10b error again
Entry  Tue Aug 5 14:43:42 2025, elog_producer, Castid, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, , , , HV, None,  
test
Entry  Tue Aug 5 16:02:12 2025, elog_producer, Castid, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, , , , HV, None,  
manual test
Entry  Tue Aug 5 16:03:08 2025, elog_producer, Castid, 45, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, 05.08.2025 16:03:03, 05.08.2025 16:03:36, 0, HV, None,  tjmonopix2_tracker.conf
automatic log for run 45
Comment:
auto test
Entry  Tue Aug 5 16:12:07 2025, elog_producer, Castid, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, , , , HV, None,  
Test debugging tests for debugging to test debugging
Entry  Tue Aug 5 16:13:54 2025, elog_producer, Castid, 46, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, 05.08.2025 16:12:04, 05.08.2025 16:14:21, 2, HV, None,  tjmonopix2_tracker.conf
automatic log for run 46
Comment:
Test debugging tests for debugging
Entry  Tue Aug 5 16:45:37 2025, elog_producer, Castid, 47, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, 05.08.2025 16:16:11, 05.08.2025 16:46:04, 29, HV, None,  tjmonopix2_tracker.conf
automatic log for run 47
Comment:
Test debugging tests for debugging
Entry  Tue Aug 5 17:42:37 2025, elog_producer, Castid, 48, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Crap, 05.08.2025 16:59:08, 05.08.2025 17:43:04, 43, HV, None,  tjmonopix2_tracker.conf
automatic log for run 48
Comment:
ELOG V3.1.5-fc6679b