Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm
|
RaMon Rate: 1.3MHz |
Sat Mar 15 13:15:25 2025, RD50 Generic User, Slab Measurement 205MeV, 6, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 13:27, 14:49, 82, , ,
|
RaMon Rate 1.3 MHz
Comments:
We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed. |
Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,
|
RaMon Rate 600kHz
front sensors 200mu: ~1kHz pro Streifen
Comments: |
Sat Mar 15 15:02:39 2025, RD50 Generic User, Rate testing, 7, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 15:04, 15:25, 21, , ,
|
RaMon Rate 4.5MHz
Comments:
From File 7 until 21 optional false, and from 22 true (everything deleted) |
Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,
|
RaMon Rate: 1.3MHz
Comments:
Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey |
Sat Mar 15 01:05:30 2025, elog-producer, Fast RO Test, 213, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 00:50:36, 15.03.2025 01:05:56, 15, HV, None, 
|
automatic log for run 213
Comment:
Fast RO for Monopix:
|
Sat Mar 15 01:22:54 2025, elog-producer, Fast RO Test, 214, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 01:08:54, 15.03.2025 01:23:21, 14, HV, None, 
|
automatic log for run 214
Comment:
Fast RO for Monopix: Medium
|
Sat Mar 15 01:29:25 2025, elog-producer, Fast RO Test, 215, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 15.03.2025 01:26:13, 15.03.2025 01:29:51, 3, HV, None, 
|
automatic log for run 215
Comment:
Lower rates then Very low settings, so just a quick run here
|
Sat Mar 15 01:38:17 2025, elog-producer, Fast RO Test, 216, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Fast RO for Monopix:
W02W01 8b10b error quite early
|
Sat Mar 15 01:51:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Run 219, Medium settings, fast RO, W02R01 to 8b10b a few minutes in |
Sat Mar 15 01:58:29 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Run 220, 8b10b error |
Sat Mar 15 02:15:34 2025, elog-producer, Fast RO Test, 221, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 15.03.2025 02:02:15, 15.03.2025 02:16:00, 13, HV, None, 
|
automatic log for run 221
Comment: |
Sat Mar 15 02:34:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,
|
Run 223, 8b10b error again |
Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,
|
RaMon Rate 400kHz
front sensors 200mu: ~10-20kHz pro Streifen
Comments: |
Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,
|
RaMon Rate not measured
front sensors 200mu: ~40-60Hz pro Streifen
Comments: |
Sat Mar 15 09:51:23 2025, RD50 Generic User, Alignment Run 800MeV, 3, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux High, Proton, Unknown, 9:44, 10:03, 19, , ,
|
RaMon Rate 2MHz
front sensors 200mu: ~50-100kHz pro Streifen
Comments: |
Sat Mar 15 10:07:28 2025, RD50 Generic User, Alignment Run 252MeV, 4, Sandwich-iCT setup(GSI)+RaMon, 252.7 MeV, Low Flux Medium, Proton, Good, 10:07, 11:43, 96, , ,
|
RaMon Rate 1MHz
front sensors 200mu: ~10-25kHz pro Streifen |
Fri Mar 14 21:54:32 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,
|
about to get p+ |
Fri Mar 14 22:09:23 2025, elog-producer, 1st tests with beam, 200, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:04:01, 14.03.2025 22:09:49, 5, HV, None, 
|
automatic log for run 200
Comment: |
Fri Mar 14 22:13:14 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,
|
APV25 latency 42 required for these input stretches |
|