ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
69
|
Sat Mar 15 16:50:39 2025 |
RD50 Generic User | Slab Test Water 1cm | 9 | Sandwich-iCT setup(GSI)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 16:35 | 17:23 | 48 | | Plastic Water Slabs | 1cm |
RaMon Rate: 1.3MHz |
66
|
Sat Mar 15 13:15:25 2025 |
RD50 Generic User | Slab Measurement 205MeV | 6 | Sandwich-iCT setup(GSI)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 13:27 | 14:49 | 82 | | | |
RaMon Rate 1.3 MHz
Comments:
We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed. |
65
|
Sat Mar 15 11:46:28 2025 |
RD50 Generic User | Slab Measurement 145MeV | 5 | Sandwich-iCT setup(GSI)+RaMon | 145.4 MeV | Low Flux Medium | Proton | Good | 11:48 | 13:13 | 85 | | | |
RaMon Rate 600kHz
front sensors 200mu: ~1kHz pro Streifen
Comments:
change of the trigger settings inbetween, we saw inefficency on all detectors |
67
|
Sat Mar 15 15:02:39 2025 |
RD50 Generic User | Rate testing | 7 | Sandwich-iCT setup(GSI)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:04 | 15:25 | 21 | | | |
RaMon Rate 4.5MHz
Comments:
From File 7 until 21 optional false, and from 22 true (everything deleted) |
68
|
Sat Mar 15 15:26:08 2025 |
RD50 Generic User | Rate testing | 8 | Sandwich-iCT setup(GSI)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | | 15:31 | 16:30 | 59 | | | |
RaMon Rate: 1.3MHz
Comments:
Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey |
30
|
Sat Mar 15 01:05:30 2025 |
elog-producer | Fast RO Test | 213 | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | 15.03.2025 00:50:36 | 15.03.2025 01:05:56 | 15 | HV | None | |
automatic log for run 213
Comment:
Fast RO for Monopix:
Delay = 2
rd_frz_delay = 2
LOAD_CONF=10
FREEZE_STOP_CONF=11
STOP_CONF=10 |
31
|
Sat Mar 15 01:22:54 2025 |
elog-producer | Fast RO Test | 214 | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | 15.03.2025 01:08:54 | 15.03.2025 01:23:21 | 14 | HV | None | |
automatic log for run 214
Comment:
Fast RO for Monopix: Medium
Delay = 20
rd_frz_delay = 20
LOAD_CONF=20
FREEZE_STOP_CONF=21
STOP_CONF=20 |
32
|
Sat Mar 15 01:29:25 2025 |
elog-producer | Fast RO Test | 215 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 15.03.2025 01:26:13 | 15.03.2025 01:29:51 | 3 | HV | None | |
automatic log for run 215
Comment:
Lower rates then Very low settings, so just a quick run here
Fast RO for Monopix:
Delay = 2
rd_frz_delay = 2
LOAD_CONF=10
FREEZE_STOP_CONF=11
STOP_CONF=10 |
33
|
Sat Mar 15 01:38:17 2025 |
elog-producer | Fast RO Test | 216 | TJ-Monopix2 | 800 MeV | Low Flux Medium | Proton | Unknown | | | | HV | None | |
Fast RO for Monopix:
W02W01 8b10b error quite early
Delay = 2
rd_frz_delay = 2
LOAD_CONF=10
FREEZE_STOP_CONF=11
STOP_CONF=10 |
34
|
Sat Mar 15 01:51:31 2025 |
elog-producer | Fast RO Test | | TJ-Monopix2 | 800 MeV | Low Flux Medium | Proton | Unknown | | | | HV | None | |
Run 219, Medium settings, fast RO, W02R01 to 8b10b a few minutes in |
35
|
Sat Mar 15 01:58:29 2025 |
elog-producer | Fast RO Test | | TJ-Monopix2 | 800 MeV | Low Flux Medium | Proton | Unknown | | | | HV | None | |
Run 220, 8b10b error |
36
|
Sat Mar 15 02:15:34 2025 |
elog-producer | Fast RO Test | 221 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 15.03.2025 02:02:15 | 15.03.2025 02:16:00 | 13 | HV | None | |
automatic log for run 221
Comment: |
37
|
Sat Mar 15 02:34:31 2025 |
elog-producer | Fast RO Test | | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | | | | HV | None | |
Run 223, 8b10b error again |
61
|
Sat Mar 15 08:52:52 2025 |
RD50 Generic User | Alignment Run 800MeV | 2 | Sandwich-iCT setup(GSI)+RaMon | 800 MeV | Low Flux Medium | Proton | Good | 08:22 | 9:40 | 78 | | | |
RaMon Rate 400kHz
front sensors 200mu: ~10-20kHz pro Streifen
Comments:
In between run, sensors were shifted by 2mm to the left (left and right in online DAQ is mirrored)
|
62
|
Sat Mar 15 08:58:26 2025 |
RD50 Generic User | Alignment Run 800MeV | 1 | Sandwich-iCT setup(GSI)+RaMon | 800 MeV | Low Flux Low | Proton | Good | 07:40 | 08:20 | 40 | | | |
RaMon Rate not measured
front sensors 200mu: ~40-60Hz pro Streifen
Comments:
stopped run due to too low rate
|
63
|
Sat Mar 15 09:51:23 2025 |
RD50 Generic User | Alignment Run 800MeV | 3 | Sandwich-iCT setup(GSI)+RaMon | 800 MeV | Low Flux High | Proton | Unknown | 9:44 | 10:03 | 19 | | | |
RaMon Rate 2MHz
front sensors 200mu: ~50-100kHz pro Streifen
Comments:
Factor 10 lost more data than measured
|
64
|
Sat Mar 15 10:07:28 2025 |
RD50 Generic User | Alignment Run 252MeV | 4 | Sandwich-iCT setup(GSI)+RaMon | 252.7 MeV | Low Flux Medium | Proton | Good | 10:07 | 11:43 | 96 | | | |
RaMon Rate 1MHz
front sensors 200mu: ~10-25kHz pro Streifen |
14
|
Fri Mar 14 21:54:32 2025 |
elog-producer | 1st tests with beam | | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | | | | HV | None | |
about to get p+ |
15
|
Fri Mar 14 22:09:23 2025 |
elog-producer | 1st tests with beam | 200 | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | 14.03.2025 22:04:01 | 14.03.2025 22:09:49 | 5 | HV | None | |
automatic log for run 200
Comment: |
16
|
Fri Mar 14 22:13:14 2025 |
elog-producer | 1st tests with beam | | TJ-Monopix2 | 800 MeV | Low Flux Very Low | Proton | Unknown | | | | HV | None | |
APV25 latency 42 required for these input stretches |