Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 18  Not logged in ELOG logo
Entry  Sat Dec 13 10:57:30 2025, elog_producer, Alignment, 4, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:27:49, 13.12.2025 10:57:55, 30, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 4
Comment:
mixed beam - testing beam settings
Entry  Sat Dec 13 11:14:38 2025, elog_producer, mixed beam, 5, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:59:00, 13.12.2025 11:15:03, 16, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 5
Comment:
10% He
Entry  Sat Dec 13 11:26:46 2025, elog_producer, mixed beam, 6, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:15:29, 13.12.2025 11:27:11, 11, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 6
Comment:
20% He
Entry  Sat Dec 13 11:29:15 2025, elog_producer, mixed beam, 7, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:27:20, 13.12.2025 11:29:40, 2, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 7
Comment:
20% He
Entry  Sat Dec 13 11:32:59 2025, elog_producer, mixed beam, 8, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:30:15, 13.12.2025 11:33:24, 3, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 8
Comment:
0% He
Entry  Sun Dec 7 00:47:00 2025, Felix Ulrich-Pur, RW3 slab, 29, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 00:47, 1:04, 17, , RW3, 1cm 
45Mb/s Events and 1Mb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow 85ns
Entry  Sun Dec 7 01:05:08 2025, Felix Ulrich-Pur, RW3 slab, 30, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 1:06, 1:14, 8, , RW3, 1cm 
80Mb/s Events and 20Mb/s rejected

PreTriggerWindow 3360ns and PostTriggerWindow 640ns
Entry  Sun Dec 7 01:21:22 2025, Felix Ulrich-Pur, RW3 slab, 31, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 1:24, 1:34, 10, , RW3, 2cm 
 

PreTriggerWindow 640ns and PostTriggerWindow 85ns
Entry  Sun Dec 7 01:40:40 2025, Felix Ulrich-Pur, RW3 slab, 32, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 1:40, 2:04, 24, , RW3, 3cm 
Problems with the source -> no beam

Beam started at 1:50

30Mb/s Events and 1Mb/s rejected
Entry  Sun Dec 7 02:09:24 2025, Felix Ulrich-Pur, RW3 slab, 33, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 2:13, 2:29, 16, , RW3, 4cm 
30Mb/s Events and 300kb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow 85ns
Entry  Sun Dec 7 02:33:26 2025, RD50 Generic User, RW3 slab, 34, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 2:34, 2:58, , , RW3, 0.5cm 
48Mb/s Events and 2Mb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow 85ns

troubles till 02:48 (dogma powercycle)
Entry  Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm 
RaMon Rate: 1.3MHz
Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 
RaMon Rate 1.5 MHz
Entry  Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm 
RaMon Rate 1.5MHz
Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 
RaMon Rate 1.4MHz
Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 
RaMon rate: 4.5MHz
Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 
totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
Entry  Sat Jun 21 20:42:42 2025, Julia Müllner, 124.4 MeV/u w slabs, 16, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:01, 21:10, 9, , PTW Slabs, 1cm 
1.041 WET RW3 (mm)
Entry  Sat Jun 21 21:11:04 2025, Julia Müllner, 124.4 MeV/u w 2slabs, 17, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:16, 21:29, 13, , PTW Slabs, 2cm 
 
Entry  Sat Jun 21 21:33:45 2025, Julia Müllner, 124.4 MeV/u w 3slabs, 18, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:34, 21:47, 13, , PTW Slabs, 3cm 
 
ELOG V3.1.5-fc6679b