Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 18  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thicknessdown Text Attachments
  335   Sat Dec 13 10:57:30 2025 elog_producerAlignment4Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 10:27:4913.12.2025 10:57:5530NormalRW3 Plate9cmautomatic log for run 4
Comment:
mixed beam - testing beam settings
 ramon.conf 
  336   Sat Dec 13 11:14:38 2025 elog_producermixed beam5Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 10:59:0013.12.2025 11:15:0316NormalRW3 Plate9cmautomatic log for run 5
Comment:
10% He
 ramon.conf 
  337   Sat Dec 13 11:26:46 2025 elog_producermixed beam6Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:15:2913.12.2025 11:27:1111NormalRW3 Plate9cmautomatic log for run 6
Comment:
20% He
 ramon.conf 
  338   Sat Dec 13 11:29:15 2025 elog_producermixed beam7Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:27:2013.12.2025 11:29:402NormalRW3 Plate9cmautomatic log for run 7
Comment:
20% He
 ramon.conf 
  339   Sat Dec 13 11:32:59 2025 elog_producermixed beam8Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:30:1513.12.2025 11:33:243NormalRW3 Plate9cmautomatic log for run 8
Comment:
0% He
 ramon.conf 
  73   Sat Mar 15 21:25:18 2025 RD50 Generic UserSlab Test Water 5cm14Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood21:2621:5024 Plastic Water Slabs5cmRaMon rate: 4.5MHz   
  72   Sat Mar 15 19:37:42 2025 RD50 Generic UserSlab Test Water 4cm12Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 19:3920:4162 Plastic Water Slabs4cmRaMon Rate 1.4MHz   
  74   Sat Mar 15 21:29:28 2025 RD50 Generic UserSlab and rate testing (with Michael)13Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood20:4421:2238 Plastic Water Slabs4cmtotzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
  
  93   Sat Jun 21 21:47:40 2025 Julia Müllner124.4 MeV/u w 4slabs19TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:5122:0514 PTW Slabs4cm    
  279   Sun Dec 7 02:09:24 2025 Felix Ulrich-PurRW3 slab33TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood2:132:2916 RW34cm30Mb/s Events and 300kb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow
85ns
  
  71   Sat Mar 15 18:37:36 2025 RD50 Generic UserSlab Test Water 3cm11Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 18:4119:2847 Plastic Water Slabs3cmRaMon Rate 1.5MHz   
  92   Sat Jun 21 21:33:45 2025 Julia Müllner124.4 MeV/u w 3slabs18TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:3421:4713 PTW Slabs3cm    
  278   Sun Dec 7 01:40:40 2025 Felix Ulrich-PurRW3 slab32TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood1:402:0424 RW33cmProblems with the source -> no beam

Beam started at 1:50

30Mb/s Events and 1Mb/s rejected
  
  70   Sat Mar 15 17:30:18 2025 RD50 Generic UserSlab Test Water 2cm10Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 17:3018:2454 Plastic Water Slabs2cmRaMon Rate 1.5 MHz   
  91   Sat Jun 21 21:11:04 2025 Julia Müllner124.4 MeV/u w 2slabs17TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:1621:2913 PTW Slabs2cm    
  277   Sun Dec 7 01:21:22 2025 Felix Ulrich-PurRW3 slab31TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood1:241:3410 RW32cm 

PreTriggerWindow 640ns and PostTriggerWindow
85ns
  
  69   Sat Mar 15 16:50:39 2025 RD50 Generic UserSlab Test Water 1cm9Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHeliumGood16:3517:2348 Plastic Water Slabs1cmRaMon Rate: 1.3MHz   
  90   Sat Jun 21 20:42:42 2025 Julia Müllner124.4 MeV/u w slabs16TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:0121:109 PTW Slabs1cm1.041 WET RW3 (mm)   
  275   Sun Dec 7 00:47:00 2025 Felix Ulrich-PurRW3 slab29TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood00:471:0417 RW31cm45Mb/s Events and 1Mb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow
85ns
  
  276   Sun Dec 7 01:05:08 2025 Felix Ulrich-PurRW3 slab30TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood1:061:148 RW31cm80Mb/s Events and 20Mb/s rejected

PreTriggerWindow 3360ns and PostTriggerWindow 640ns
  
ELOG V3.1.5-fc6679b