Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 19 of 19  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Datadown t-Start t-Stop Duration_min Frontend Phantom Phantom thickness Text Attachments
  197   Sat Aug 16 23:44:00 2025 Maximilian BabelukCASTID - Summary TJ-Monopix2800 MeV Proton       Summary for the CASTID shift RO Aug 16,
2025
  
  268   Sat Dec 6 22:20:09 2025 Felix Ulrich-Pur205.2 MeV/u systemtest22TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHelium 22:2222:3412 None PreTriggerWindow 640ns and PostTriggerWindwo
85ns
  
  272   Sat Dec 6 23:35:39 2025 Felix Ulrich-Pur97.2MeV/u systemtest26TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon97.2MeV/uLow Flux HighHelium 23:3623:4913 None 36 Mb/s Events and 500kB/s rejected

PreTriggerWindow 640ns and PostTriggerWindow
85ns
  
ELOG V3.1.5-fc6679b