Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 19 of 19  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stopdown Duration_min Frontend Phantom Phantom thickness
  283   Sun Dec 7 04:39:16 2025 RD50 Generic UserMaus137TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood4:40 3 Mouse 

angle = 0

x/y=-39/-21

PreTriggerWindow 640ns and PostTriggerWindow 85n

37 no ramon

  293   Sun Dec 7 05:22:24 2025 RD50 Generic UserMaus247TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumCrap5:41   Mouse 

angle = 0

x/y=-66/-25

rate:6 10e6

PreTriggerWindow 3.36us and PostTriggerWindow 46n

bis 5:48 kein beam, erste spills mit 400MeV

did not work -> new run with adapted settings

  328   Sun Dec 7 08:15:21 2025 RD50 Generic UserMaus383TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood    Mouse 

angle = 180

x/y=-21/-44.5 (falsche Richtung :( )

rate:6 10e6

PreTriggerWindow 2.915us and PostTriggerWindow 85ns

ELOG V3.1.5-fc6679b