Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 19 of 19  Not logged in ELOG logo
Entry  Sat Aug 16 23:44:00 2025, Maximilian Babeluk, CASTID - Summary, , TJ-Monopix2, 800 MeV, , Proton, , , , , , ,  
Summary for the CASTID shift RO Aug 16, 2025

We measured four TJ-Monopix2 DUTS with HV/HVC frontends using AIDA mode in a stacked telescope configuration. We used 800MeV protons at low flux
Entry  Sat Dec 6 22:20:09 2025, Felix Ulrich-Pur, 205.2 MeV/u systemtest, 22, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, , 22:22, 22:34, 12, , None,  
PreTriggerWindow 640ns and PostTriggerWindwo 85ns
Entry  Sat Dec 6 23:35:39 2025, Felix Ulrich-Pur, 97.2MeV/u systemtest, 26, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, , 23:36, 23:49, 13, , None,  
36 Mb/s Events and 500kB/s rejected

PreTriggerWindow 640ns and PostTriggerWindow 85ns
ELOG V3.1.5-fc6679b