just to check if the beam was there
interupted to get inside the room
setup was moved, stopped to move setup again
threshold = 4000
Setup wurde verschoben: 5mm vorne nach links und hinten 4mm, in Beamrichtung
threshold = 2000
PreTriggerWindow 640ns und PostTriggerWindow 85ns
17:43: eventbuilder restart since lots of rejected triggers
2us TriggerWindow insgesamt: 640ns PostTriggerWindow und 1360 PreTriggerWindow, max 60Mb/s Events und 25Mb/s rejected pro Eventbuilder
PreTriggerWindow 640ns and PostTriggerWindow 85ns
Max 70Mb/s and Droprate 6 Mb/s
PreTriggerWindow 3360ns and PostTriggerWindow 640ns
Max 100Mb/s Events and 50Mb/s rejected
rejected roughly 10-20%, 8MHz beam
rejected quite a lot of data later -> eventloader restarted
axis 1: 5
axis 2: 2
degrader 10, mouse is still inside
110 Mb/s Events, 65 Mb/s rejected
runs of hadesp81 nicht umbenannt
PreTriggerWindow 640ns and PostTriggerWindwo 85ns
Threshold set to 5000
dead channels on last LGAD, changed trigger from LGAD 12 to LGAD 11
last events already with 400MeV/u