Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 13 of 13  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  127   Sun Jun 22 04:23:59 2025 Julia Müllner124.4 MeV mouse53TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:244:339   

axis1: 1

axis 2: -1

  128   Sun Jun 22 04:34:00 2025 Julia Müllner124.4 MeV mouse54TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:344:439   

axis 1: 1

axis 2: 2

  129   Sun Jun 22 04:44:05 2025 Julia Müllner124.4 MeV mouse55TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:444:539   

axis 1: 1

axis 2: 5

  130   Sun Jun 22 04:53:41 2025 Julia Müllner124.4 MeV mouse56TOF-Cal GSI124.4 MeV/uLow Flux HighHelium 4:595:034   

axis 1: 5

axis 2: 2

mouse is upside down

  131   Sun Jun 22 05:03:52 2025 Julia Müllner124.4 MeV mouse57TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood5:065:1610   

axis 1: -24

axis 2: 2

still upside down

  48   Sat Mar 15 04:26:35 2025 elog-producer test rate limits 233TJ-Monopix2800 MeVLow Flux MediumProtonUnknown15.03.2025 04:24:0615.03.2025 04:27:012HVNone 
automatic log for run 233
Comment:
Increase csinti thr to -0.05
  49   Sat Mar 15 04:28:39 2025 elog-producer test rate limits 234TJ-Monopix2800 MeVLow Flux MediumProtonUnknown15.03.2025 04:28:2315.03.2025 04:29:060HVNone 
automatic log for run 234
Comment:
Increase csinti thr to -0.075
ELOG V3.1.5-fc6679b