Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 13 of 13  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Datadown t-Start t-Stop Duration_min Frontend Phantom Phantom thickness Text Attachments
  70   Sat Mar 15 17:30:18 2025 RD50 Generic UserSlab Test Water 2cm10Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 17:3018:2454 Plastic Water Slabs2cmRaMon Rate 1.5 MHz   
  71   Sat Mar 15 18:37:36 2025 RD50 Generic UserSlab Test Water 3cm11Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 18:4119:2847 Plastic Water Slabs3cmRaMon Rate 1.5MHz   
  72   Sat Mar 15 19:37:42 2025 RD50 Generic UserSlab Test Water 4cm12Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 19:3920:4162 Plastic Water Slabs4cmRaMon Rate 1.4MHz   
  98   Sat Jun 21 23:49:42 2025 Julia Müllner124.4 MeV mouse24TOF-Cal GSI124.4 MeV/uLow Flux HighHelium 23:5023:599   axis 1: 9

axis 2: 17 
  
  100   Sun Jun 22 00:08:17 2025 Julia Müllner124.4 MeV mouse26TOF-Cal GSI124.4 MeV/uLow Flux HighHelium 0:090:178   axis 1: 9

axis 2: 11
  
  130   Sun Jun 22 04:53:41 2025 Julia Müllner124.4 MeV mouse56TOF-Cal GSI124.4 MeV/uLow Flux HighHelium 4:595:034   axis 1: 5

axis 2: 2

mouse is upside down
  
  197   Sat Aug 16 23:44:00 2025 Maximilian BabelukCASTID - Summary TJ-Monopix2800 MeV Proton       Summary for the CASTID shift RO Aug 16,
2025
  
ELOG V3.1.5-fc6679b