Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 13 of 19  Not logged in ELOG logo
ID Date Author Subject Run Numberdown DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness Text Attachments
  333   Sat Dec 13 08:06:08 2025 elog_producerAlignment2TOF-Cal_GSI_8LGAD+RaMon200 MeV/uLow Flux High Good13.12.2025 07:56:3113.12.2025 08:06:3410NormalNone automatic log for run 2
Comment:
initial alignment run
 ramon.conf 
  93   Sat Jun 21 21:47:40 2025 Julia Müllner124.4 MeV/u w 4slabs19TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:5122:0514 PTW Slabs4cm    
  265   Sat Dec 6 21:20:03 2025 Felix Ulrich-Pur402MeV/u systemtest19TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon402MeV/uLow Flux HighHeliumGood21:2121:3716 None PreTriggerWindow 640ns and PostTriggerWindow
85ns

Max 70Mb/s and Droprate 6 Mb/s
  
  350   Sat Dec 13 16:00:08 2025 elog_producerenergy calibration19Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 15:02:1513.12.2025 16:00:3458NormalRW3 Plate11cmautomatic log for run 19
Comment:
2x ionization chambers
 ramon.conf 
  92   Sat Jun 21 21:33:45 2025 Julia Müllner124.4 MeV/u w 3slabs18TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:3421:4713 PTW Slabs3cm    
  264   Sat Dec 6 20:29:53 2025 Felix Ulrich-Pur402MeV/u systemtest18TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon402MeV/uLow Flux HighHeliumGood20:5021:1929 None 2us TriggerWindow insgesamt: 640ns PostTriggerWindow und
1360 PreTriggerWindow, max 60Mb/s Events und
25Mb/s rejected pro Eventbuilder
  
  349   Sat Dec 13 14:48:42 2025 elog_producerenergy calibration18Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Crap13.12.2025 14:43:1413.12.2025 14:49:075NormalRW3 Plate automatic log for run 18
Comment:
2x ionization chambers
 ramon.conf 
  91   Sat Jun 21 21:11:04 2025 Julia Müllner124.4 MeV/u w 2slabs17TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:1621:2913 PTW Slabs2cm    
  263   Sat Dec 6 20:15:47 2025 Felix Ulrich-Pursystemtest carbon17TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon  CarbonGood20:1620:2913 None 400.1MeV, Degrader 10   
  348   Sat Dec 13 14:18:49 2025 elog_producerenergy calibration17Sandwich-iCT setup(GSI)+RaMon63.3 MeV/uLow Flux HighHeliumGood13.12.2025 14:02:3013.12.2025 14:19:1416NormalNone automatic log for run 17
Comment:
calibration run 63.3 MeV
 ramon.conf 
  90   Sat Jun 21 20:42:42 2025 Julia Müllner124.4 MeV/u w slabs16TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood21:0121:109 PTW Slabs1cm1.041 WET RW3 (mm)   
  262   Sat Dec 6 19:59:15 2025 Felix Ulrich-Pur800MeV systemtest16TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon800 MeVLow Flux HighHeliumGood19:5920:0910 None 40Mb/s Events and 4 Mb/s rejected

PreTriggerWindow: 1360ns and PostTriggerWindow: 640ns
  
  347   Sat Dec 13 14:00:52 2025 elog_producerenergy calibration16Sandwich-iCT setup(GSI)+RaMon73.2 MeV/uLow Flux HighHeliumGood13.12.2025 13:47:2313.12.2025 14:01:1813NormalNone automatic log for run 16
Comment:
calibration run 73.2 MeV
 ramon.conf 
  89   Sat Jun 21 20:32:58 2025 Julia Müllner402MeV systemtest 15TOF-Cal GSI402MeV/uLow Flux HighHeliumGood20:3520:4712   rejected roughly 10-20%, 8MHz beam

rejected quite a lot of data later
-> eventloader restarted
  
  261   Sat Dec 6 19:47:32 2025 Felix Ulrich-Pur800MeV systemtest15TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon800 MeVLow Flux HighProtonGood19:4819:579 None PreTriggerWindow: 640ns and PostTriggerWindow:
3.36µs

25Mb/s Events and 25Mb/s rejected
  
  346   Sat Dec 13 13:45:59 2025 elog_producerenergy calibration15Sandwich-iCT setup(GSI)+RaMon97.2MeV/uLow Flux HighHeliumGood13.12.2025 13:35:1213.12.2025 13:46:2411NormalNone automatic log for run 15
Comment:
calibration run 97.2 MeV
 ramon.conf 
  73   Sat Mar 15 21:25:18 2025 RD50 Generic UserSlab Test Water 5cm14Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood21:2621:5024 Plastic Water Slabs5cmRaMon rate: 4.5MHz   
  88   Sat Jun 21 20:24:05 2025 Julia Müllner205.2 MeV systemtest 14TOF-Cal GSI205.2 MeV/uLow Flux HighHeliumGood20:2420:328   last events already with 400MeV/u   
  260   Sat Dec 6 19:20:24 2025 Felix Ulrich-Pur800MeV systemtest14TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon800 MeVLow Flux HighProtonGood19:3019:4515 None 3360ns PreTriggerWindow and 640ns PostTriggerWindow

Had to restart eventbuilder at
19:39 due to high rejected rate
  
  345   Sat Dec 13 13:33:47 2025 elog_producerenergy calibration14Sandwich-iCT setup(GSI)+RaMon124.4 MeV/uLow Flux HighHeliumGood13.12.2025 13:24:4713.12.2025 13:34:139NormalNone automatic log for run 14
Comment:
alignment run 124.4 MeV
 ramon.conf 
ELOG V3.1.5-fc6679b