Data was good, we have to shuft the setup in x direction and slightly down. Enter room request 17:12.
400.1MeV, Degrader 10
36 Mb/s Events and 500kB/s rejected
PreTriggerWindow 640ns and PostTriggerWindow 85ns
Threshold change from 50 to 500
10GB collected
rejected roughly 10-20%, 8MHz beam
rejected quite a lot of data later -> eventloader restarted
Recorded data: 20GB
PreTriggerWindow 640ns and PostTriggerWindwo 85ns
new callibration was done, dimanond detector connected to readout
Threshold = 4000
thresholds were too low -> run was canceled
16GB collected