Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 10  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Jun 21 17:01:05 2025, Julia Müllner, 97.2 MeV systemtest , 4, TOF-Cal GSI, 97.2MeV/u, Low Flux High, Helium, Good, 16:58, 17:11, 13, , ,  
Data was good, we have to shuft the setup in x direction and slightly down. Enter room request 17:12.
Entry  Sat Jun 21 17:13:34 2025, Julia Müllner, 97.2 MeV systemtest , 5, TOF-Cal GSI, 97.2MeV/u, Low Flux High, Helium, Good, 17:31, 17:54, 23, , ,  
Threshold set to 3000

moved Ripple filters back in 

100GB data collected
Entry  Sat Jun 21 17:54:27 2025, Julia Müllner, 97.2 MeV systemtest , 6, TOF-Cal GSI, 97.2MeV/u, Low Flux High, Helium, Good, 17:56, 18:04, 8, , ,  
Threshold set to 4000

40GB data collected
Entry  Sat Jun 21 18:05:21 2025, Julia Müllner, 97.2 MeV systemtest , 7, TOF-Cal GSI, 97.2MeV/u, Low Flux High, Helium, Good, 18:06, 18:21, 15, , ,  
Threshold set to 2000

50GB data collected

Room Entry Request: 18:21
Entry  Sat Mar 15 04:11:28 2025, elog-producer, energy scans, 231, TJ-Monopix2, 83 MeV, Low Flux Very Low, Proton, Crap, 15.03.2025 04:00:20, 15.03.2025 04:11:54, 11, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 231
Comment:
Entry  Sat Mar 15 04:20:39 2025, elog-producer, energy scans, 232, TJ-Monopix2, 83 MeV, Low Flux Very Low, Proton, Good, 15.03.2025 04:13:51, 15.03.2025 04:21:05, 7, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 232
Comment:
Entry  Wed Mar 12 09:29:08 2025, tb-crew, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
1st test
Entry  Thu Mar 13 16:29:06 2025, tb-crew, validating setup, 94, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:27:33, 13.03.2025 16:29:31, 1, HV, None,  tjmonopix2.conf
automatic log for run 94
Comment:
tests without beam 
Entry  Thu Mar 13 16:36:43 2025, tb-crew, validating setup, 95, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:34:19, 13.03.2025 16:37:08, 2, HV, None,  tjmonopix2.conf
automatic log for run 95
Comment:
tests without beam 
Entry  Fri Mar 14 19:47:58 2025, mausi, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
system tests
Entry  Fri Mar 14 19:50:29 2025, elog-producer, validating setup, 109, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:49:10, 14.03.2025 19:50:55, 1, HV, None,  tjmonopix2.conf
automatic log for run 109
Comment:
system tests
Entry  Fri Mar 14 19:57:28 2025, elog-producer, validating setup, 110, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:51:51, 14.03.2025 19:57:54, 6, HV, None,  tjmonopix2.conf
automatic log for run 110
Comment:
bla
Entry  Fri Mar 14 20:04:41 2025, elog-producer, validating setup, 111, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:03:34, 14.03.2025 20:05:07, 1, HV, None,  tjmonopix2.conf
automatic log for run 111
Comment:
bla
Entry  Fri Mar 14 20:40:06 2025, elog-producer, validating setup, 112, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:07:47, 14.03.2025 20:40:32, 32, HV, None,  tjmonopix2.conf
automatic log for run 112
Comment:
still testing nonsense
Entry  Fri Mar 14 21:40:34 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
tracker test without beam
Entry  Fri Mar 14 21:41:12 2025, elog-producer, validating setup, 116, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:41:05, 14.03.2025 21:41:38, 0, HV, None,  tjmonopix2.conf
automatic log for run 116
Comment:
tracker test without beam
Entry  Fri Mar 14 21:43:10 2025, elog-producer, validating setup, 117, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:42:46, 14.03.2025 21:43:36, 0, HV, None,  tjmonopix2.conf
automatic log for run 117
Comment:
tracker test without beam
Entry  Fri Mar 14 21:44:46 2025, elog-producer, validating setup, 118, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:44:20, 14.03.2025 21:45:12, 0, HV, None,  tjmonopix2.conf
automatic log for run 118
Comment:
tracker test without beam
Entry  Fri Mar 14 21:53:59 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
starting beam
Entry  Fri Mar 14 21:54:32 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
about to get p+
ELOG V3.1.5-fc6679b