Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 4  Not logged in ELOG logo
Entry  Sat Mar 15 09:51:23 2025, RD50 Generic User, Alignment Run 800MeV, 3, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux High, Proton, Unknown, 9:44, 10:03, 19, , ,  
RaMon Rate 2MHz

front sensors 200mu: ~50-100kHz pro Streifen

Comments:
Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 
RaMon rate: 4.5MHz
Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 
totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 
RaMon Rate 1.4MHz
Entry  Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm 
RaMon Rate 1.5MHz
Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 
RaMon Rate 1.5 MHz
Entry  Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm 
RaMon Rate: 1.3MHz
Entry  Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,  
RaMon Rate: 1.3MHz

Comments:

Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey
Entry  Sat Mar 15 15:02:39 2025, RD50 Generic User, Rate testing, 7, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 15:04, 15:25, 21, , ,  
RaMon Rate 4.5MHz

Comments:

From File 7 until 21 optional false, and from 22 true (everything deleted)
Entry  Sat Mar 15 05:42:14 2025, elog-producer, test 8b10b, 246, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:38:42, 15.03.2025 05:42:41, 3, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 246
Comment:
BDAQ Board to Monopix connection swapped - and now the W02R01 chip works fine with full rate
Entry  Sat Mar 15 05:27:08 2025, elog-producer, test 8b10b, 245, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:26:52, 15.03.2025 05:27:34, 0, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 245
Comment:
test with swapped ethernet ports and bsaq IP adresses
Entry  Sat Mar 15 05:12:19 2025, elog-producer, test 8b10b, 244, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:08:03, 15.03.2025 05:12:46, 4, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 244
Comment:
both chips, more stat with small window on W02R01
Entry  Sat Mar 15 05:06:44 2025, elog-producer, test 8b10b, 243, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:05:59, 15.03.2025 05:07:10, 1, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 243
Comment:
Entry  Sat Mar 15 05:02:22 2025, elog-producer, test 8b10b, 242, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:00:58, 15.03.2025 05:02:48, 1, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 242
Comment:
more quadratic now
Entry  Sat Mar 15 04:58:42 2025, elog-producer, test 8b10b, 241, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:56:53, 15.03.2025 04:59:08, 2, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 241
Comment:
test HVC fe
Entry  Sat Mar 15 04:51:42 2025, elog-producer, test 8b10b, 239, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:50:08, 15.03.2025 04:52:09, 2, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 239
Comment:
THR -0.2
Entry  Sat Mar 15 04:48:44 2025, elog-producer, test 8b10b, 238, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:47:55, 15.03.2025 04:49:10, 1, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 238
Comment:
THR -0.2
Entry  Sat Mar 15 04:42:48 2025, elog-producer, test rate limits, 237, TJ-Monopix2, 800 MeV, Low Flux High, Proton, Unknown, 15.03.2025 04:40:28, 15.03.2025 04:43:14, 2, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 237
Comment:
Increase csinti thr to -0.3
Entry  Sat Mar 15 04:39:13 2025, elog-producer, test rate limits, 236, TJ-Monopix2, 800 MeV, Low Flux High, Proton, Unknown, 15.03.2025 04:38:04, 15.03.2025 04:39:39, 1, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 236
Comment:
Increase csinti thr to -0.2
Entry  Sat Mar 15 04:35:45 2025, elog-producer, test rate limits, 235, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:29:57, 15.03.2025 04:36:12, 6, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 235
Comment:
Increase csinti thr to -0.2
ELOG V3.1.5-fc6679b