Entry  Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm 
RaMon Rate: 1.3MHz
Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 
RaMon Rate 1.5 MHz
Entry  Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm 
RaMon Rate 1.5MHz
Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 
RaMon Rate 1.4MHz
Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 
RaMon rate: 4.5MHz
Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 
totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
Entry  Wed Mar 12 09:29:08 2025, tb-crew, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
1st test
Entry  Thu Mar 13 16:29:06 2025, tb-crew, validating setup, 94, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:27:33, 13.03.2025 16:29:31, 1, HV, None,  tjmonopix2.conf
automatic log for run 94
Comment:
tests without beam 
Entry  Thu Mar 13 16:36:43 2025, tb-crew, validating setup, 95, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 13.03.2025 16:34:19, 13.03.2025 16:37:08, 2, HV, None,  tjmonopix2.conf
automatic log for run 95
Comment:
tests without beam 
Entry  Fri Mar 14 19:47:58 2025, mausi, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
system tests
Entry  Fri Mar 14 19:50:29 2025, elog-producer, validating setup, 109, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:49:10, 14.03.2025 19:50:55, 1, HV, None,  tjmonopix2.conf
automatic log for run 109
Comment:
system tests
Entry  Fri Mar 14 19:57:28 2025, elog-producer, validating setup, 110, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:51:51, 14.03.2025 19:57:54, 6, HV, None,  tjmonopix2.conf
automatic log for run 110
Comment:
bla
Entry  Fri Mar 14 20:04:41 2025, elog-producer, validating setup, 111, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:03:34, 14.03.2025 20:05:07, 1, HV, None,  tjmonopix2.conf
automatic log for run 111
Comment:
bla
Entry  Fri Mar 14 20:40:06 2025, elog-producer, validating setup, 112, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:07:47, 14.03.2025 20:40:32, 32, HV, None,  tjmonopix2.conf
automatic log for run 112
Comment:
still testing nonsense
Entry  Fri Mar 14 21:40:34 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
tracker test without beam
Entry  Fri Mar 14 21:41:12 2025, elog-producer, validating setup, 116, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:41:05, 14.03.2025 21:41:38, 0, HV, None,  tjmonopix2.conf
automatic log for run 116
Comment:
tracker test without beam
Entry  Fri Mar 14 21:43:10 2025, elog-producer, validating setup, 117, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:42:46, 14.03.2025 21:43:36, 0, HV, None,  tjmonopix2.conf
automatic log for run 117
Comment:
tracker test without beam
Entry  Fri Mar 14 21:44:46 2025, elog-producer, validating setup, 118, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:44:20, 14.03.2025 21:45:12, 0, HV, None,  tjmonopix2.conf
automatic log for run 118
Comment:
tracker test without beam
Entry  Fri Mar 14 21:53:59 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
starting beam
Entry  Fri Mar 14 21:54:32 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
about to get p+