Sat Mar 15 10:07:28 2025, RD50 Generic User, Alignment Run 252MeV, 4, Sandwich-iCT setup(GSI)+RaMon, 252.7 MeV, Low Flux Medium, Proton, Good, 10:07, 11:43, 96, , ,
|
RaMon Rate 1MHz
front sensors 200mu: ~10-25kHz pro Streifen |
Fri Mar 14 22:20:25 2025, elog-producer, 1st tests with beam, 201, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:11:23, 14.03.2025 22:20:51, 9, HV, None, 
|
automatic log for run 201
Comment: |
Fri Mar 14 23:35:49 2025, elog-producer, 1st tests with beam, 209, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 23:26:44, 14.03.2025 23:36:16, 9, HV, None, 
|
automatic log for run 209
Comment: |
Sat Mar 15 03:29:19 2025, elog-producer, energy scans, 228, TJ-Monopix2, 175.3 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 03:20:02, 15.03.2025 03:29:45, 9, HV, None, 
|
automatic log for run 228
Comment: |
Sat Mar 15 03:39:19 2025, elog-producer, energy scans, 229, TJ-Monopix2, 145.4 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 03:30:42, 15.03.2025 03:39:45, 9, HV, None, 
|
automatic log for run 229
Comment: |
Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,
|
RaMon Rate 600kHz
front sensors 200mu: ~1kHz pro Streifen
Comments: |
Sat Mar 15 13:15:25 2025, RD50 Generic User, Slab Measurement 205MeV, 6, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 13:27, 14:49, 82, , ,
|
RaMon Rate 1.3 MHz
Comments:
We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed. |
Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,
|
RaMon Rate 400kHz
front sensors 200mu: ~10-20kHz pro Streifen
Comments: |
Sat Mar 15 04:20:39 2025, elog-producer, energy scans, 232, TJ-Monopix2, 83 MeV, Low Flux Very Low, Proton, Good, 15.03.2025 04:13:51, 15.03.2025 04:21:05, 7, HV, None, 
|
automatic log for run 232
Comment: |
Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm
|
RaMon Rate 1.4MHz |
Fri Mar 14 19:57:28 2025, elog-producer, validating setup, 110, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:51:51, 14.03.2025 19:57:54, 6, HV, None,
|
automatic log for run 110
Comment:
bla |
Sat Mar 15 04:35:45 2025, elog-producer, test rate limits, 235, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:29:57, 15.03.2025 04:36:12, 6, HV, None, 
|
automatic log for run 235
Comment:
Increase csinti thr to -0.2 |
Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,
|
RaMon Rate: 1.3MHz
Comments:
Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey |
Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm
|
RaMon Rate 1.5 MHz |
Fri Mar 14 22:09:23 2025, elog-producer, 1st tests with beam, 200, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:04:01, 14.03.2025 22:09:49, 5, HV, None, 
|
automatic log for run 200
Comment: |
Fri Mar 14 22:47:46 2025, elog-producer, 1st tests with beam, 203, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:42:30, 14.03.2025 22:48:12, 5, HV, None, 
|
automatic log for run 203
Comment: |
Sat Mar 15 16:50:39 2025, RD50 Generic User, Slab Test Water 1cm, 9, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 16:35, 17:23, 48, , Plastic Water Slabs, 1cm
|
RaMon Rate: 1.3MHz |
Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm
|
RaMon Rate 1.5MHz |
Sat Mar 15 00:46:34 2025, elog-producer, proper run, 212, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 15.03.2025 00:05:08, 15.03.2025 00:47:00, 41, HV, None, 
|
automatic log for run 212
Comment: |
Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,
|
RaMon Rate not measured
front sensors 200mu: ~40-60Hz pro Streifen
Comments: |
|