Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024, Page 2 of 11  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Dec 14 15:39:42 2024, Felix Ulrich-Pur, plastic mouse radiography, 60, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 23:50, 00:08, 18, , plastic mouse,  
pos x=-100, posy=-75

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:39:11 2024, Felix Ulrich-Pur, plastic mouse radiography, 59, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 23:33, 23:46, 13, , plastic mouse,  
pos x=-175, posy=-75

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:37:48 2024, Felix Ulrich-Pur, plastic mouse radiography, 58, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 23:17, 23:30, 13, , plastic mouse,  
pos x=-175, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:37:26 2024, Felix Ulrich-Pur, plastic mouse radiography, 57, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 23:02, 23:16, 14, , plastic mouse,  
pos x=-100, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:36:37 2024, Felix Ulrich-Pur, plastic mouse radiography, 56, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 22:46, 23:00, 14, , plastic mouse,  
pos x=-25, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:35:56 2024, Felix Ulrich-Pur, plastic mouse radiography, 55, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 22:12, 22:45, 33, , plastic mouse,  
pos x=25, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:34:50 2024, Felix Ulrich-Pur, plastic mouse radiography, 54, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 21:58, 22:10, 22, , plastic mouse,  
pos x=100, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:33:35 2024, Felix Ulrich-Pur, plastic mouse radiography, 53, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 21:33, 21:57, 24, , plastic mouse,  
run 52 was crap

pos x=175, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000
Entry  Sat Dec 14 15:31:32 2024, Felix Ulrich-Pur, plastic mouse radiography, 51, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 21:14, 21:30, 16, , plastic mouse,  
before run, mouse was aligned with lasers and shift of beam w.r.t. sensor center was taken into account

pos x=250, posy=0

TRB Setup: 260V bias and 250mA pre-amps, threshold 5000
Entry  Sat Dec 14 15:30:23 2024, Felix Ulrich-Pur, threshold and preamp tests, 50, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 20:19, 20:35, 16, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 5000 (looks good, clustersize max at ~3)

Diamond: 900mA, threshold 1000 offset

4MHz Ramon 370kHz TRB
Entry  Sat Dec 14 15:28:46 2024, Felix Ulrich-Pur, threshold and preamp tests, 49, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 20:04, 20:09, 5, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 10000 (was too high)

Diamond: 900mA, threshold 1000 offset

3.5MHz Ramon
Entry  Sat Dec 14 15:27:08 2024, Felix Ulrich-Pur, WET measurement slabs, 48, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 19:30, 19:50, 20, , Dense Bone Slabs, 5cm 
5cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:26:18 2024, Felix Ulrich-Pur, WET measurement slabs, 47, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 19:16, 19:29, 13, , Dense Bone Slabs, 5cm 
5cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:25:12 2024, Felix Ulrich-Pur, WET measurement slabs, 46, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 18:55, 19:11, 16, , Dense Bone Slabs, 4cm 
4cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:24:22 2024, Felix Ulrich-Pur, WET measurement slabs, 45, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 18:37, 18:51, 14, , Dense Bone Slabs, 4cm 
4cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:23:21 2024, Felix Ulrich-Pur, WET measurement slabs, 44, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 18:19, 18:33, 14, , Dense Bone Slabs, 2cm 
3cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:21:44 2024, Felix Ulrich-Pur, WET measurement slabs, 43, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 18:04, 18:18, 14, , Dense Bone Slabs, 3cm 
3cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:20:52 2024, Felix Ulrich-Pur, WET measurement slabs, 42, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 17:48, 18:00, 12, , Dense Bone Slabs, 2cm 
2cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:19:57 2024, Felix Ulrich-Pur, WET measurement slabs, 41, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 17:32, 17:44, 12, , Dense Bone Slabs, 2cm 
2cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
Entry  Sat Dec 14 15:18:48 2024, Felix Ulrich-Pur, WET measurement slabs, 40, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 17:14, 17:28, 14, , Dense Bone Slabs, 1cm 
1cm dense bone

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset
ELOG V3.1.5-fc6679b