22.04.23 23:58 trigger on third LGAD
no DUT
beam was down between 00:05 and 00:15
23.04.23 00:17 trigger on third LGAD
23.04.23 00:35 trigger on third LGAD
23.04.23 01:09 trigger on third LGAD
6 PMMA slabs (~1cm)