ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Events Data Beam Betatron Beam Chopper Beam Degraderdown Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle
  95   Sat Feb 27 18:56:11 2021 Felix Ulrich-PurWaveforms SiC+Si21SiC+Si+RaMon252.7nominalProton Good  50     

Start 13:56

Degrader 50


channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

 

  170   Tue Mar 16 15:10:41 2021 Patrick SiebererPad Sensoren25 252.7nominalProton Good  50   none 

Start: 14:06
Range Shifter Out, Filter 1 IN, Filter 2 IN

  49   Wed Jan 20 17:25:34 2021 Felix Ulrich-PurLowflux p800 commissioning56Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
1cm off in +x and +y direction
Setting IV

  50   Wed Jan 20 17:27:58 2021 Felix Ulrich-PurLowflux p800 commissioning57Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
2cm off in +x and +y direction (wrong direction)
setting IV
 

  51   Wed Jan 20 17:28:56 2021 Felix Ulrich-PurLowflux p800 commissioning58Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
looks +0.5vcm x, -0.5cm y
rate quite low
setting IV
 

  52   Wed Jan 20 17:29:42 2021 Felix Ulrich-PurLowflux p800 commissioning59Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
x is centered now, y looks 0.25cm off
setting IV
 

  53   Wed Jan 20 17:30:17 2021 Felix Ulrich-PurLowflux p800 commissioning60Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
rate few 100Hz
x looks off, y centered now (after -0.25cm in y correction)
setting IV
 

  55   Wed Jan 20 17:31:30 2021 Felix Ulrich-PurLowflux p800 commissioning63Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
beam almost centered (total correction +15mm x (to the left in beam direction) and +7.5 mm y (down in beam direction)

rate between 100Hz and 70 kHz
setting IV
 

  56   Wed Jan 20 17:33:58 2021 Felix Ulrich-PurLowflux p800 commissioning64Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
beam  centered (total correction +12.5mm x (to the left in beam direction) and +7.5 mm y (down in beam direction)

rate between 100Hz and 70 kHz, few 100Hz spills
setting IV
 

  57   Wed Jan 20 17:35:25 2021 Felix Ulrich-PurLowflux p800 commissioning62Ramon+Tracker800  30 spills 10%60%20106dB   

MT=1, BSY=50,
now correct degrader, beam still off
setting IV
 

  58   Wed Jan 20 17:35:51 2021 Felix Ulrich-PurLowflux p800 commissioning66Ramon+Tracker800  30 spills 10%62%20106dB   

MT=1, BSY=50,
beam is centered
rate few 100kHz and two peaks in beam profile
setting IV
 

  59   Wed Jan 20 17:36:21 2021 Felix Ulrich-PurLowflux p800 commissioning65Ramon+Tracker800  30 spills 10%80%20106dB   

MT=1, BSY=50,
beam shifted again
jumps in rate too high
setting IV
 

  60   Wed Jan 20 17:41:27 2021 Felix Ulrich-PurLowflux p800 commissioning67Ramon+Tracker800  30 spills 10%60.5%20106dB   

MT=1, BSY=50,
beam shifted again
max 30kHz, low rate
setting IV
 

  61   Wed Jan 20 17:42:02 2021 Felix Ulrich-PurLowflux p800 commissioning68Ramon+Tracker800  30 spills 11%60%20106dB   

MT=1, BSY=50,
setting IV
 

  62   Wed Jan 20 17:42:31 2021 Felix Ulrich-PurLowflux p800 commissioning69Ramon+Tracker800  30 spills 11%60.5%20106dB   

MT=1, BSY=50,
setting IV
 

  63   Wed Jan 20 17:42:38 2021 Felix Ulrich-PurLowflux p800 commissioning71Ramon+Tracker800  30 spills 11%60.25%20106dB   

MT=1, BSY=50,
setting IV
 

  64   Wed Jan 20 17:44:19 2021 Felix Ulrich-PurLowflux p800 commissioning73Ramon+Tracker800  30 spills 100%60.5%20106dB   

MT=1, BSY=50,
setting V

spot still centered
quite stable
~120kHz
steering setting IV

  65   Wed Jan 20 17:46:32 2021 Felix Ulrich-PurLowflux p800 commissioning74Ramon+Tracker800  30 spills 11%60.5%20306dB   

MT=1, BSY=50,
potential setting VI

few outlier, fewer fluctuations
steering setting IV

  66   Wed Jan 20 17:47:24 2021 Felix Ulrich-PurLowflux p800 commissioning75Ramon+Tracker800  30 spills 12%60.5%20306dB   

MT=1, BSY=50,
setting VI

few outlier, fewer fluctuations
final setting VI
steering setting IV

  67   Wed Jan 20 17:47:53 2021 Felix Ulrich-PurLowflux p800 commissioning76Ramon+Tracker800  30 spills 100%60.5%20306dB   

MT=1, BSY=50,

beam off
potential setting VII
steering setting IV