TB 24.4.21 Alignment run
TB 24.4.21
0deg (1cm Alu) Profil von Stiege
90deg (0.2-1cmAlu)
0deg (1cm Alu)
0deg (1cm PMMA)
timing was adjusted and FADC had to be restarted
90deg (0.2-1cm PMMA)
0deg (1cm ABS)
corrected trigger position for fluence loss radiography
TB 19.6.21
Start 06:00 startet with wrong setting at the beginning (6 instead of 5) rate was then corrected, but RaMon was still running.
Final rate: 100kHz setting 07:24: room request: changed channel on board (was not connected to osci)
Start 07:51 beam was paused at 10:10
bias run and threshold optimization
mean rate was O(100kHz)
Start 11:21 paused beam at 13:36 15:40-16:20 ECR source fail--downtime
Mean rate O(MHz)
Start 17:13
Start 17:42 Mean rate O(MHz)
Start 18:15 Mean rate O(MHz)
Start 18:48 Mean rate O(MHz)
Start 19:16 Mean rate O(MHz)
Start 19:43 rate setting was not set correctly deg20 in combination with setting VII instead of nominal flux deg10