TB 19.6.21
Start 17:42 Mean rate O(MHz)
Start 17:13
Mean rate O(MHz)
Start 11:21 paused beam at 13:36 15:40-16:20 ECR source fail--downtime
Start 07:51 beam was paused at 10:10
bias run and threshold optimization
mean rate was O(100kHz)
Start 06:00 startet with wrong setting at the beginning (6 instead of 5) rate was then corrected, but RaMon was still running.
Final rate: 100kHz setting 07:24: room request: changed channel on board (was not connected to osci)
TB 24.4.21
corrected trigger position for fluence loss radiography
0deg (1cm ABS)
0deg (1cm PMMA)
90deg (0.2-1cm PMMA)
timing was adjusted and FADC had to be restarted
0deg (1cm Alu)
90deg (0.2-1cmAlu)
0deg (1cm Alu) Profil von Stiege
TB 24.4.21 Alignment run
Energy Scan 03:06-5:18 MHz Rate Danach: Abbauen
Energy Scan 03:02 4Hz, VII -> MHz ?
Energy Scan 02:48 1-6M Hz!