Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 5 of 18  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Jan 20 17:33:58 2021, Felix Ulrich-Pur, Lowflux p800 commissioning, 64, Ramon+Tracker, 800, , , 30 spills, , 10%, 60%, 20, 10, 6dB, , ,  

MT=1, BSY=50,
beam  centered (total correction +12.5mm x (to the left in beam direction) and +7.5 mm y (down in beam direction)

rate between 100Hz and 70 kHz, few 100Hz spills
setting IV
 

Entry  Sat Feb 27 23:29:33 2021, Christian Irmler, HV Scan DSSD+SiC, 64, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 18:09:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 200V

Entry  Tue Mar 16 15:28:13 2021, Patrick Sieberer, SiC strip sensor, 64, Ramon+Tracker, 252.7, I(EFE+SID0), Proton, , Crap, , , , , , , ,  

2er Koinzidenz
Alignment Run SiC -> Crap, FADCs abgeschmiert

Entry  Wed Jan 20 17:31:30 2021, Felix Ulrich-Pur, Lowflux p800 commissioning, 63, Ramon+Tracker, 800, , , 30 spills, , 10%, 60%, 20, 10, 6dB, , ,  

MT=1, BSY=50,
beam almost centered (total correction +15mm x (to the left in beam direction) and +7.5 mm y (down in beam direction)

rate between 100Hz and 70 kHz
setting IV
 

Entry  Sat Feb 27 23:21:35 2021, Christian Irmler, HV Scan DSSD+SiC, 63, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 17:58:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 300V

Entry  Tue Mar 16 15:27:14 2021, Patrick Sieberer, MPW2 Tracking, 63, Ramon+Tracker, 252.7, I(EFE+SID0), Proton, , Good, , , , , , , ,  

2er Koinzidenz
Tracker only, ALIGNMENT
Danach: Umbau auf SiC (Junctionboard geaendert) fuer SiC Alignment

Entry  Wed Jan 20 17:35:25 2021, Felix Ulrich-Pur, Lowflux p800 commissioning, 62, Ramon+Tracker, 800, , , 30 spills, , 10%, 60%, 20, 10, 6dB, , ,  

MT=1, BSY=50,
now correct degrader, beam still off
setting IV
 

Entry  Sat Feb 27 19:13:02 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 62, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , ,  

Start 17:45:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 400V

Entry  Tue Mar 16 15:26:21 2021, Patrick Sieberer, MPW2 Tracking, 62, Ramon+Tracker, 252.7, I(EFE+SID0), Proton, , Crap, , , , , , , ,  

2er Koinzidenz
Tracker only, Alignment run -> FADC crashed

Entry  Wed Jan 20 17:31:04 2021, Felix Ulrich-Pur, Lowflux p800 commissioning, 61, Ramon+Tracker, 800, , , 30 spills, Crap, 10%, 60%, 10, 10, 6dB, , ,  

wrong degrader setting
setting IV
 

Entry  Sat Feb 27 19:12:19 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 61, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Crap, , , , , , , ,  

Start 17:44:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW

HV 400V

Entry  Tue Mar 16 15:25:50 2021, Patrick Sieberer, MPW2 Tracking, 61, MPW2+tracker, 252.7, I(EFE+SID0), Proton, , Crap, , , , , , , ,  

2er Koinzidenz
Row 3 Col 4
for Beam

Entry  Wed Jan 20 17:30:17 2021, Felix Ulrich-Pur, Lowflux p800 commissioning, 60, Ramon+Tracker, 800, , , 30 spills, , 10%, 60%, 20, 10, 6dB, , ,  

MT=1, BSY=50,
rate few 100Hz
x looks off, y centered now (after -0.25cm in y correction)
setting IV
 

Entry  Sat Feb 27 19:10:14 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 60, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Crap, , , , , , , ,  

Start 17:30:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW

HV 300V

Entry  Tue Mar 16 15:25:29 2021, Patrick Sieberer, MPW2 Tracking, 60, MPW2+tracker, 252.7, I(EFE+SID0), Proton, , Good, , , , , , , ,  

3er Koinzidenz
Row 3 Col 4
WINDOW RUN
Trigger-Busy + Max Trigger unkown, check in log-file

Entry  Sun Jan 10 06:38:16 2021, Maximilian Tomaschek, Lowflux recommissioning, 6, Ramon+Tracker, 83, , , 30 spills, , 10%, , 10, 1, , , ,  

Rate

Entry  Sat Feb 27 09:31:57 2021, Felix Ulrich-Pur, Rate verification, 6, SiC+Si+RaMon, 252.7, I(EFE+SID0), , , Good, , , , , , , ,  

Start 07:16
rate looks fine,

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

SiC: man sieht erstmals Signale 

Entry  Tue Mar 16 14:56:22 2021, Patrick Sieberer, Pad Sensoren, 6, , 145.4, III(EFE+SID2), Proton, , Good, , , , , , , none,  

Start: 07:42
Range Shifter Out, Filter 1 IN, Filter 2 IN

Entry  Wed May 12 08:51:42 2021, Felix Ulrich-Pur, Alu 0deg, 6, Drehtisch, 145.4, II(BETA+EFE), Proton, , Good, , , , , , , Alu, 0 

TB 24.4.21

0deg (1cm Alu)

Entry  Sun Jun 20 19:37:09 2021, Felix Ulrich-Pur, HADES energy run, 6, HADES-LGADs, 145.4, I(EFE+SID0), Proton, , Good, , , , , , , none, 0 

TB 19.6.21

Start 18:15
Mean rate O(MHz)
 

ELOG V3.1.5-fc6679b