Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 4 of 18  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Jan 10 07:26:31 2021, Maximilian Tomaschek, Lowflux recommissioning, 38, Ramon+Tracker, 175.3, , , 7 spills 1e6 events, Good, , , 10, 1, , 0, ,  

Spotsize

Entry  Sun Jan 10 07:26:42 2021, Maximilian Tomaschek, Lowflux recommissioning, 39, Ramon+Tracker, 145.4, , , 7 spills 1e6 events, Good, , , 10, 1, , 0, ,  

Spotsize

Entry  Sun Jan 10 07:26:58 2021, Maximilian Tomaschek, Lowflux recommissioning, 40, Ramon+Tracker, 100.4, , , 7 spills 1e6 events, Good, , , 10, 1, , 0, ,  

Spotsize

Entry  Sun Jan 10 07:27:37 2021, Maximilian Tomaschek, Lowflux recommissioning, 45, Ramon+Tracker, 83, , , 7 spills 1e6 events, Good, , , 10, 1, , 0, ,  

Spotsize

Entry  Sun Jan 10 07:27:55 2021, Maximilian Tomaschek, Lowflux recommissioning, 47, Ramon+Tracker, 62.4, , , 7 spills 1e6 events, Good, , , 10, 1, , 0, ,  

Spotsize, max T 1 & BSY 50 -> rate zu hoch

Entry  Sun Jan 10 07:29:09 2021, Maximilian Tomaschek, Lowflux recommissioning, 48, Ramon+Tracker, 252.7, , , 40 spills 250k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:30:58 2021, Maximilian Tomaschek, Lowflux recommissioning, 49, Ramon+Tracker, 194.3, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:32:00 2021, Maximilian Tomaschek, Lowflux recommissioning, 50, Ramon+Tracker, 175.3, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:32:11 2021, Maximilian Tomaschek, Lowflux recommissioning, 51, Ramon+Tracker, 145.4, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:32:22 2021, Maximilian Tomaschek, Lowflux recommissioning, 52, Ramon+Tracker, 100.4, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:32:34 2021, Maximilian Tomaschek, Lowflux recommissioning, 53, Ramon+Tracker, 83, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:32:46 2021, Maximilian Tomaschek, Lowflux recommissioning, 54, Ramon+Tracker, 62.4, , , 40 spills 350k events, Good, 10%, , 10, 1, , 2, ,  

Spotsize

Entry  Sun Jan 10 07:33:19 2021, Maximilian Tomaschek, Lowflux recommissioning, 55, Peakfinder, 252.7, , , 40 spills 350k events, Good, , , 10, 1, , 0, ,  

fail MAPTA Sensor, not trigger, only signal with 5s spill 5s pause (spill over time meas), looked similar

Entry  Wed Jan 20 17:12:15 2021, Felix Ulrich-Pur, Lowflux recommissioning, 4, Ramon+Tracker, 145.4, , , 30 spills, , 10%, , 10, 1, , , ,  

Rate

Entry  Wed Jan 20 17:15:32 2021, Felix Ulrich-Pur, Lowflux recommissioning, 13, Ramon+Tracker, 145.4, , , 30 spills, , 10%, , 10, 1, , 2, ,  

Rate

Entry  Sat Feb 27 09:26:27 2021, Felix Ulrich-Pur, Rate verification, 1, SiC+Si+RaMon, 62.4, III(EFE+SID2), , , Unknown, , , , , , , ,  

Start 06:37
rate looks okish. few emtpy spills

 

2021-02-27, 06:07:

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.112V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

2021-02-27, 06:30:

Referenz: 2.477V channel 1
channel 2 unverändert
 

2021-02-27, 06:37:

Setting: 3 

Run 1: 6:37 62.4 MeV, Rate geringer als erwartet 

 

Entry  Sat Feb 27 09:28:07 2021, Felix Ulrich-Pur, Rate verification, 2, SiC+Si+RaMon, 252.7, III(EFE+SID2), , , Crap, , , , , , , ,  

Start 06:47
rate only 10Hz, stopped run, room request and rewired trigger.

NOTE: Problem was caused by operators: Optics were not set correctly after ramping up energy from 62.4 to 252.7, not trigger cable

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:29:41 2021, Felix Ulrich-Pur, Rate verification, 4, SiC+Si+RaMon, 252.7, III(EFE+SID2), , , Good, , , , , , , ,  

Start 06:55
reallocated correctly, rate looks similar to old measurements now (kHz ish)

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:30:32 2021, Felix Ulrich-Pur, Rate verification, 5, SiC+Si+RaMon, 62.4, III(EFE+SID2), , , Good, , , , , , , ,  

Start 07:03
verified if run 1 was reliable-->Same results

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:31:57 2021, Felix Ulrich-Pur, Rate verification, 6, SiC+Si+RaMon, 252.7, I(EFE+SID0), , , Good, , , , , , , ,  

Start 07:16
rate looks fine,

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

SiC: man sieht erstmals Signale 

ELOG V3.1.5-fc6679b