short run for uploading to analysis
TLU: 6,8M Tracker nur 4 M -> Let's reset FADC
repeat run 9 again ;)
run 11 used for new local runs of tracker - hvcmos_mpw3_20221008_11_TLU_00-000011.xml
tracker seems fine, at least in the beginning
again APV sync errors at the end of the run
Start 19:35: Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V
Start 19:14: Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
Spotsize
Spotsize, max T 1 & BSY 50 -> rate zu hoch
Start 23:24 Threshold MPW2: 960mV, Pixel R1 C1 MaxTrigger: 1, Trigger-busy: 500 2 Koinzidenz TLU und 3er Koinzidenz Messmodus am MPW
Start: 15:19
1 cm Alu stair phantom on rotary table (0deg--> always 1cm Al in beam)
Start: 16:40
1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu)
Start: 18:00
1 cm Alu stair phantom on rotary table (90deg)
Start: 19:28
1 cm Alu stair phantom on rotary table (0deg)
Energy Scan 03:06-5:18 MHz Rate Danach: Abbauen
Start 17:58: Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
HV 300V
Start 18:09: Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
HV 200V