Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 17 of 18  Not logged in ELOG logo
Entry  Sun Nov 7 19:09:50 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 24, , 252.7, II(BETA+EFE), Proton, , Good, , , , , , , none,  

Start: 13:58

Alignment run without phantom

Entry  Sun Nov 7 19:10:31 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 25, , 145.4, II(BETA+EFE), Proton, 40e6, Good, , , , , , , none,  

Start: 14:04

Reference run without phantom

Entry  Sun Nov 7 19:11:24 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 26, Drehtisch, 145.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 0 

Start: 15:19

1 cm Alu stair phantom on rotary table (0deg--> always 1cm Al in beam)

Entry  Sun Nov 7 19:12:57 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 27, Drehtisch, 145.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90 

Start: 16:40

1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu)

Entry  Sun Nov 7 19:13:36 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 28, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90 

Start: 18:00

1 cm Alu stair phantom on rotary table (90deg)

Entry  Sun Nov 7 19:28:49 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 29, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 0 

Start: 19:28

1 cm Alu stair phantom on rotary table (0deg)

Entry  Sun Nov 7 21:04:43 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 30, , 100.4, II(BETA+EFE), Proton, 40e6, Good, , , , , , , none,  

Start: 21.04

reference run 100.4MeV

Entry  Sat Dec 11 17:48:08 2021, Felix Ulrich-Pur, Fluence loss 1cm, 4, DSSD-Tracker, 800, V, Proton, , Good, , , , , , , Alu, 0 deg 

Fluence loss measurement 11.12.2021

Start 15:15

0deg =1cm Alu

Entry  Sat Dec 11 18:19:56 2021, Felix Ulrich-Pur, Fluence loss 1cm, 5, DSSD-Tracker, 800, V, Proton, , Good, , , , , , , Alu, 0 deg 

Fluence loss measurement 11.12.2021

Start 18:17

90deg = all five steps Alu

Entry  Sat Feb 27 23:35:43 2021, Christian Irmler, E Scan DSSD+SiC, 68, SiC+DSSD tracker, 83, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 19:00:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:39:57 2021, Christian Irmler, E Scan DSSD+SiC, 69, SiC+DSSD tracker, 62.4, II(BETA+EFE), Proton, 7E5, Good, , , , , , , ,  

Start 19:14:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:40:54 2021, Christian Irmler, E Scan DSSD+SiC, 70, SiC+DSSD tracker, 252.7, II(BETA+EFE), Proton, 7E8, Good, , , , , , , ,  

Start 19:35:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:42:38 2021, Christian Irmler, E Scan DSSD+SiC, 71, SiC+DSSD tracker, 194.3, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 19:47:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:45:38 2021, Christian Irmler, E Scan DSSD+SiC, 72, SiC+DSSD tracker, 175.3, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 19:59:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:56:11 2021, Christian Irmler, E Scan DSSD+SiC, 73, SiC+DSSD tracker, 145.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  

Start 20:10:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sat Feb 27 23:56:58 2021, Christian Irmler, E Scan DSSD+SiC, 74, SiC+DSSD tracker, 800, II(BETA+EFE), Proton, 3.1E6, Good, , , , , , , ,  

Start 20:24:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

Entry  Sun Nov 21 13:51:53 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 1, SiC+Si, 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,  

Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope channel 3.

Triggering source was the SiC detector.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

Entry  Sun Nov 21 13:55:05 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 2, SiC+Si, 62.4, I(EFE+SID0), Proton, 1000000, , , , , , , , ,  

Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope channel 3.

Triggering source was the Si detector.

The compliancy of the SiC SMU triggered after approx. 50% of the events had been acquired after this event the HV for the SiC HV was shut down.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

Entry  Sun Nov 21 14:05:18 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 3, , 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,  

Bias voltage SiC: 800

Bias voltage Si LGAD: -100

From a beam perspective the SiC detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope channel 1.

Triggering source was the Si LGAD detector. The SiC detector was most probably defective.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

Entry  Sun Nov 21 14:53:00 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 4, Diamond+LGAD, 62.4, I(EFE+SID0), Proton, 100000, , , , , , , , ,  

Bias voltage Diamond: 500

Bias voltage Si LGAD: -100

From a beam perspective the Diamond detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope channel 1.

Triggering source was the Si LGAD detector.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

ELOG V3.1.5-fc6679b