Sun Nov 7 19:09:50 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 24, , 252.7, II(BETA+EFE), Proton, , Good, , , , , , , none,
|
Start: 13:58
Alignment run without phantom |
Sun Nov 7 19:10:31 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 25, , 145.4, II(BETA+EFE), Proton, 40e6, Good, , , , , , , none,
|
Start: 14:04
Reference run without phantom |
Sun Nov 7 19:11:24 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 26, Drehtisch, 145.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 0
|
Start: 15:19
1 cm Alu stair phantom on rotary table (0deg--> always 1cm Al in beam) |
Sun Nov 7 19:12:57 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 27, Drehtisch, 145.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90
|
Start: 16:40
1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu) |
Sun Nov 7 19:13:36 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 28, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90
|
Start: 18:00
1 cm Alu stair phantom on rotary table (90deg) |
Sun Nov 7 19:28:49 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 29, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 0
|
Start: 19:28
1 cm Alu stair phantom on rotary table (0deg) |
Sun Nov 7 21:04:43 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 30, , 100.4, II(BETA+EFE), Proton, 40e6, Good, , , , , , , none,
|
Start: 21.04
reference run 100.4MeV |
Sat Dec 11 17:48:08 2021, Felix Ulrich-Pur, Fluence loss 1cm, 4, DSSD-Tracker, 800, V, Proton, , Good, , , , , , , Alu, 0 deg
|
Fluence loss measurement 11.12.2021
Start 15:15
0deg =1cm Alu |
Sat Dec 11 18:19:56 2021, Felix Ulrich-Pur, Fluence loss 1cm, 5, DSSD-Tracker, 800, V, Proton, , Good, , , , , , , Alu, 0 deg
|
Fluence loss measurement 11.12.2021
Start 18:17
90deg = all five steps Alu |
Sat Feb 27 23:35:43 2021, Christian Irmler, E Scan DSSD+SiC, 68, SiC+DSSD tracker, 83, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,
|
Start 19:00:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:39:57 2021, Christian Irmler, E Scan DSSD+SiC, 69, SiC+DSSD tracker, 62.4, II(BETA+EFE), Proton, 7E5, Good, , , , , , , ,
|
Start 19:14:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:40:54 2021, Christian Irmler, E Scan DSSD+SiC, 70, SiC+DSSD tracker, 252.7, II(BETA+EFE), Proton, 7E8, Good, , , , , , , ,
|
Start 19:35:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:42:38 2021, Christian Irmler, E Scan DSSD+SiC, 71, SiC+DSSD tracker, 194.3, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,
|
Start 19:47:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:45:38 2021, Christian Irmler, E Scan DSSD+SiC, 72, SiC+DSSD tracker, 175.3, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,
|
Start 19:59:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:56:11 2021, Christian Irmler, E Scan DSSD+SiC, 73, SiC+DSSD tracker, 145.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,
|
Start 20:10:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sat Feb 27 23:56:58 2021, Christian Irmler, E Scan DSSD+SiC, 74, SiC+DSSD tracker, 800, II(BETA+EFE), Proton, 3.1E6, Good, , , , , , , ,
|
Start 20:24:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal
HV 500V |
Sun Nov 21 13:51:53 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 1, SiC+Si, 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,
|
Bias voltage SiC: 800
Bias voltage Si: -150
From a beam perspective the Si detector was the first target, on oscilloscope channel 1, SiC was the second target connected to oscilloscope |
Sun Nov 21 13:55:05 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 2, SiC+Si, 62.4, I(EFE+SID0), Proton, 1000000, , , , , , , , ,
|
Bias voltage SiC: 800
Bias voltage Si: -150
From a beam perspective the Si detector was the first target, on oscilloscope channel 1, SiC was the second target connected to oscilloscope |
Sun Nov 21 14:05:18 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 3, , 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,
|
Bias voltage SiC: 800
Bias voltage Si LGAD: -100
From a beam perspective the SiC detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope |
Sun Nov 21 14:53:00 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 4, Diamond+LGAD, 62.4, I(EFE+SID0), Proton, 100000, , , , , , , , ,
|
Bias voltage Diamond: 500
Bias voltage Si LGAD: -100
From a beam perspective the Diamond detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to |
|