ID Date Author Subjectdown Run Number DUT Beam Energy Rate Setting Particle Type Events Data Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle
  295   Sun Nov 7 19:09:50 2021 Felix Ulrich-PurFluence loss meas 7.11.2124 252.7II(BETA+EFE)Proton Good      none 

Start: 13:58

Alignment run without phantom

  296   Sun Nov 7 19:10:31 2021 Felix Ulrich-PurFluence loss meas 7.11.2125 145.4II(BETA+EFE)Proton40e6Good      none 

Start: 14:04

Reference run without phantom

  297   Sun Nov 7 19:11:24 2021 Felix Ulrich-PurFluence loss meas 7.11.2126Drehtisch145.4II(BETA+EFE)Proton60e6Good      Alu0

Start: 15:19

1 cm Alu stair phantom on rotary table (0deg--> always 1cm Al in beam)

  298   Sun Nov 7 19:12:57 2021 Felix Ulrich-PurFluence loss meas 7.11.2127Drehtisch145.4II(BETA+EFE)Proton60e6Good      Alu90

Start: 16:40

1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu)

  299   Sun Nov 7 19:13:36 2021 Felix Ulrich-PurFluence loss meas 7.11.2128Drehtisch100.4II(BETA+EFE)Proton60e6Good      Alu90

Start: 18:00

1 cm Alu stair phantom on rotary table (90deg)

  300   Sun Nov 7 19:28:49 2021 Felix Ulrich-PurFluence loss meas 7.11.2129Drehtisch100.4II(BETA+EFE)Proton60e6Good      Alu0

Start: 19:28

1 cm Alu stair phantom on rotary table (0deg)

  301   Sun Nov 7 21:04:43 2021 Felix Ulrich-PurFluence loss meas 7.11.2130 100.4II(BETA+EFE)Proton40e6Good      none 

Start: 21.04

reference run 100.4MeV

  309   Sat Dec 11 17:48:08 2021 Felix Ulrich-PurFluence loss 1cm4DSSD-Tracker800VProton Good      Alu0 deg

Fluence loss measurement 11.12.2021

Start 15:15

0deg =1cm Alu

  310   Sat Dec 11 18:19:56 2021 Felix Ulrich-PurFluence loss 1cm5DSSD-Tracker800VProton Good      Alu0 deg

Fluence loss measurement 11.12.2021

Start 18:17

90deg = all five steps Alu

  110   Sat Feb 27 23:35:43 2021 Christian IrmlerE Scan DSSD+SiC68SiC+DSSD tracker83II(BETA+EFE)Proton5E5Good        

Start 19:00:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  111   Sat Feb 27 23:39:57 2021 Christian IrmlerE Scan DSSD+SiC69SiC+DSSD tracker62.4II(BETA+EFE)Proton7E5Good        

Start 19:14:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  112   Sat Feb 27 23:40:54 2021 Christian IrmlerE Scan DSSD+SiC70SiC+DSSD tracker252.7II(BETA+EFE)Proton7E8Good        

Start 19:35:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  113   Sat Feb 27 23:42:38 2021 Christian IrmlerE Scan DSSD+SiC71SiC+DSSD tracker194.3II(BETA+EFE)Proton5E5Good        

Start 19:47:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  114   Sat Feb 27 23:45:38 2021 Christian IrmlerE Scan DSSD+SiC72SiC+DSSD tracker175.3II(BETA+EFE)Proton5E5Good        

Start 19:59:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  115   Sat Feb 27 23:56:11 2021 Christian IrmlerE Scan DSSD+SiC73SiC+DSSD tracker145.4II(BETA+EFE)Proton5E5Good        

Start 20:10:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  116   Sat Feb 27 23:56:58 2021 Christian IrmlerE Scan DSSD+SiC74SiC+DSSD tracker800II(BETA+EFE)Proton3.1E6Good        

Start 20:24:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  302   Sun Nov 21 13:51:53 2021 Simon WaidComparison SiC, Si, Si LGAD and Diamond1SiC+Si62.4I(EFE+SID0)Proton10000         

Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope channel 3.

Triggering source was the SiC detector.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

  303   Sun Nov 21 13:55:05 2021 Simon WaidComparison SiC, Si, Si LGAD and Diamond2SiC+Si62.4I(EFE+SID0)Proton1000000         

Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope channel 3.

Triggering source was the Si detector.

The compliancy of the SiC SMU triggered after approx. 50% of the events had been acquired after this event the HV for the SiC HV was shut down.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

  304   Sun Nov 21 14:05:18 2021 Simon WaidComparison SiC, Si, Si LGAD and Diamond3 62.4I(EFE+SID0)Proton10000         

Bias voltage SiC: 800

Bias voltage Si LGAD: -100

From a beam perspective the SiC detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope channel 1.

Triggering source was the Si LGAD detector. The SiC detector was most probably defective.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

  305   Sun Nov 21 14:53:00 2021 Simon WaidComparison SiC, Si, Si LGAD and Diamond4Diamond+LGAD62.4I(EFE+SID0)Proton100000         

Bias voltage Diamond: 500

Bias voltage Si LGAD: -100

From a beam perspective the Diamond detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope channel 1.

Triggering source was the Si LGAD detector.

Data was stored on the HiBPM-Osci-2 NUC under c:\measurements

ELOG V3.1.5-fc6679b