Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 16 of 18  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energydown Rate Setting Particle Type Events Data Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle
  101   Sat Feb 27 19:09:26 2021 Felix Ulrich-PurHV Scan DSSD+SiC59SiC+DSSD tracker100.4II(BETA+EFE)Proton Crap        

Start 17:14:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
HV 200 V, accidentally ZS instead of RAW

  102   Sat Feb 27 19:10:14 2021 Felix Ulrich-PurHV Scan DSSD+SiC60SiC+DSSD tracker100.4II(BETA+EFE)Proton Crap        

Start 17:30:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW

HV 300V

  103   Sat Feb 27 19:12:19 2021 Felix Ulrich-PurHV Scan DSSD+SiC61SiC+DSSD tracker100.4II(BETA+EFE)Proton Crap        

Start 17:44:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW

HV 400V

  104   Sat Feb 27 19:13:02 2021 Felix Ulrich-PurHV Scan DSSD+SiC62SiC+DSSD tracker100.4II(BETA+EFE)Proton Good        

Start 17:45:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 400V

  105   Sat Feb 27 23:21:35 2021 Christian IrmlerHV Scan DSSD+SiC63SiC+DSSD tracker100.4II(BETA+EFE)Proton5E5Good        

Start 17:58:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 300V

  106   Sat Feb 27 23:29:33 2021 Christian IrmlerHV Scan DSSD+SiC64SiC+DSSD tracker100.4II(BETA+EFE)Proton5E5Good        

Start 18:09:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 200V

  107   Sat Feb 27 23:32:40 2021 Christian IrmlerHV Scan DSSD+SiC65SiC+DSSD tracker100.4II(BETA+EFE)Proton5E5Good        

Start 18:20:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 500V

  108   Sat Feb 27 23:33:19 2021 Christian IrmlerHV Scan DSSD+SiC66SiC+DSSD tracker100.4II(BETA+EFE)Proton5E5Good        

Start 18:33:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V

  109   Sat Feb 27 23:33:55 2021 Christian IrmlerHV Scan DSSD+SiC67SiC+DSSD tracker100.4II(BETA+EFE)Proton5E5Good        

Start 18:46:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 700V

  141   Tue Mar 2 16:00:38 2021 Patrick SiebererMPW2 Analog output104MPW2+Picoscope100.4I(EFE+SID0)Proton1kGood        

MPW2 ANALOG
Threshold MPW2: 960mV, Pixel R3 C3, Pixel R3 C4, Pixel R0 C1. Pixel R0 C6
3 Koinzidenz TLU und Hybrid Modus (2er und 3er Koinzidenz) am MPW

1k ADC curves per pixel
 

  161   Tue Mar 16 15:05:08 2021 Patrick SiebererPad Sensoren16 100.4II(BETA+EFE)Proton Good      none 

Start: 11:38
Range Shifter Out, Filter 1 IN, Filter 2 IN

  165   Tue Mar 16 15:07:06 2021 Patrick SiebererPad Sensoren20 100.4I(EFE+SID0)Proton Good      none 

Start: 12:25
Range Shifter Out, Filter 1 IN, Filter 2 IN
Changed compliance of both sensors to 100 uA

  166   Tue Mar 16 15:07:56 2021 Patrick SiebererPad Sensoren21 100.4III(EFE+SID2)Proton Good      none 

Start: 12:41
Range Shifter Out, Filter 1 IN, Filter 2 IN
12:53 went inside to test if sensors are activated

  208   Tue Mar 16 15:34:25 2021 Patrick SiebererSiC strip sensor71SiC+DSSD tracker100.4II(BETA+EFE)Proton1.2MGood        

Energy Scan
00:46
Filter vermutlich draussen

  217   Wed May 12 08:48:19 2021 Felix Ulrich-PurAlu 0deg3Drehtisch100.4II(BETA+EFE)Proton Good      Alu0

TB 24.4.21
 

0deg (1cm Alu) Profil von Stiege

  218   Wed May 12 08:49:59 2021 Felix Ulrich-PurAlu 90deg4Drehtisch100.4II(BETA+EFE)Proton Good      Alu90

TB 24.4.21

90deg (0.2-1cmAlu)

  223   Wed May 12 08:53:46 2021 Felix Ulrich-PurPMMA 90deg11Drehtisch100.4II(BETA+EFE)Proton Good      PMMA90

TB 24.4.21

90deg (0.2-1cm PMMA)

  224   Wed May 12 08:54:54 2021 Felix Ulrich-PurPMMA 0deg12Drehtisch100.4II(BETA+EFE)Proton Good      PMMA0

TB 24.4.21

0deg (1cm PMMA)

  228   Sun Jun 20 19:30:28 2021 Felix Ulrich-PurHADES testrun 100.4MeV2HADES-LGADs100.4II(BETA+EFE)Proton Good      none0

TB 19.6.21

Start 07:51
beam was paused at 10:10

bias run and threshold optimization

mean rate was O(100kHz)

  229   Sun Jun 20 19:33:06 2021 Felix Ulrich-PurHADES testrun with increased rate 100.4MeV3HADES-LGADs100.4I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 11:21
paused beam at 13:36
15:40-16:20 ECR source fail--downtime

Mean rate O(MHz)

ELOG V3.1.5-fc6679b