Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 16 of 18  Not logged in ELOG logo
Entry  Sat Feb 27 19:09:26 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 59, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Crap, , , , , , , ,  
Start 17:14:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
HV 200 V, accidentally ZS instead of RAW
Entry  Sat Feb 27 19:10:14 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 60, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Crap, , , , , , , ,  
Start 17:30:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW
Entry  Sat Feb 27 19:12:19 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 61, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Crap, , , , , , , ,  
Start 17:44:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal
accidentally ZS instead of RAW
Entry  Sat Feb 27 19:13:02 2021, Felix Ulrich-Pur, HV Scan DSSD+SiC, 62, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , ,  
Start 17:45:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 400V
Entry  Sat Feb 27 23:21:35 2021, Christian Irmler, HV Scan DSSD+SiC, 63, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  
Start 17:58:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 300V
Entry  Sat Feb 27 23:29:33 2021, Christian Irmler, HV Scan DSSD+SiC, 64, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  
Start 18:09:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 200V
Entry  Sat Feb 27 23:32:40 2021, Christian Irmler, HV Scan DSSD+SiC, 65, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  
Start 18:20:
Final MT=1, final BSY length =500 (2kHz), Trigger latency 41 optimal

HV 500V
Entry  Sat Feb 27 23:33:19 2021, Christian Irmler, HV Scan DSSD+SiC, 66, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  
Start 18:33:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 500V
Entry  Sat Feb 27 23:33:55 2021, Christian Irmler, HV Scan DSSD+SiC, 67, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 5E5, Good, , , , , , , ,  
Start 18:46:
Final MT=1, final BSY length =600 (2kHz), Trigger latency 41 optimal

HV 700V
Entry  Tue Mar 2 16:00:38 2021, Patrick Sieberer, MPW2 Analog output, 104, MPW2+Picoscope, 100.4, I(EFE+SID0), Proton, 1k, Good, , , , , , , ,  
MPW2 ANALOG
Threshold MPW2: 960mV, Pixel R3 C3, Pixel R3 C4, Pixel R0 C1. Pixel R0 C6
3 Koinzidenz TLU und Hybrid Modus (2er und 3er Koinzidenz) am MPW
Entry  Tue Mar 16 15:05:08 2021, Patrick Sieberer, Pad Sensoren, 16, , 100.4, II(BETA+EFE), Proton, , Good, , , , , , , none,  
Start: 11:38
Range Shifter Out, Filter 1 IN, Filter 2 IN
Entry  Tue Mar 16 15:07:06 2021, Patrick Sieberer, Pad Sensoren, 20, , 100.4, I(EFE+SID0), Proton, , Good, , , , , , , none,  
Start: 12:25
Range Shifter Out, Filter 1 IN, Filter 2 IN
Changed compliance of both sensors to 100 uA
Entry  Tue Mar 16 15:07:56 2021, Patrick Sieberer, Pad Sensoren, 21, , 100.4, III(EFE+SID2), Proton, , Good, , , , , , , none,  
Start: 12:41
Range Shifter Out, Filter 1 IN, Filter 2 IN
12:53 went inside to test if sensors are activated
Entry  Tue Mar 16 15:34:25 2021, Patrick Sieberer, SiC strip sensor, 71, SiC+DSSD tracker, 100.4, II(BETA+EFE), Proton, 1.2M, Good, , , , , , , ,  
Energy Scan
00:46
Filter vermutlich draussen
Entry  Wed May 12 08:48:19 2021, Felix Ulrich-Pur, Alu 0deg, 3, Drehtisch, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , Alu, 0 
TB 24.4.21
 

0deg (1cm Alu) Profil von Stiege
Entry  Wed May 12 08:49:59 2021, Felix Ulrich-Pur, Alu 90deg, 4, Drehtisch, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , Alu, 90 
TB 24.4.21

90deg (0.2-1cmAlu)
Entry  Wed May 12 08:53:46 2021, Felix Ulrich-Pur, PMMA 90deg, 11, Drehtisch, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , PMMA, 90 
TB 24.4.21

90deg (0.2-1cm PMMA)
Entry  Wed May 12 08:54:54 2021, Felix Ulrich-Pur, PMMA 0deg, 12, Drehtisch, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , PMMA, 0 
TB 24.4.21

0deg (1cm PMMA)
Entry  Sun Jun 20 19:30:28 2021, Felix Ulrich-Pur, HADES testrun 100.4MeV, 2, HADES-LGADs, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , none, 0 
TB 19.6.21

Start 07:51
beam was paused at 10:10
Entry  Sun Jun 20 19:33:06 2021, Felix Ulrich-Pur, HADES testrun with increased rate 100.4MeV, 3, HADES-LGADs, 100.4, I(EFE+SID0), Proton, , Good, , , , , , , none, 0 
TB 19.6.21

Start 11:21
paused beam at 13:36
ELOG V3.1.5-fc6679b