TB 24.4.21
90deg (0.2-1cmAlu)
90deg (0.2-1cm PMMA)
Start: 16:40
1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu)
Start: 18:00
1 cm Alu stair phantom on rotary table (90deg)
Fluence loss measurement 11.12.2021
Start 15:15
0deg =1cm Alu
Start 18:17
90deg = all five steps Alu
0deg (1cm Alu) Profil von Stiege
0deg (1cm Alu)
0deg (1cm PMMA)
timing was adjusted and FADC had to be restarted
0deg (1cm ABS)
corrected trigger position for fluence loss radiography
TB 19.6.21
Start 06:00 startet with wrong setting at the beginning (6 instead of 5) rate was then corrected, but RaMon was still running.
Final rate: 100kHz setting 07:24: room request: changed channel on board (was not connected to osci)
Start 07:51 beam was paused at 10:10
bias run and threshold optimization
mean rate was O(100kHz)
Start 11:21 paused beam at 13:36 15:40-16:20 ECR source fail--downtime
Mean rate O(MHz)
Start 17:13
Start 17:42 Mean rate O(MHz)
Start 18:15 Mean rate O(MHz)