Start 14:18
14:30 enter room request: abbau and shielding was activated, called RP, removed SiC+Si Setup+Al shielding of DSSDs
Degrader 10, Carbon
Messung bis 14:24
danach neue Aufzeichnung (Hintergrundstrahlung) Start ca 14:25
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |