| Start 14:18 
 14:30 enter room request: abbau and shielding was activated, called RP, removed SiC+Si Setup+Al shielding of DSSDs
 Degrader 10, CarbonMessung bis 14:24
 danach neue Aufzeichnung (Hintergrundstrahlung) Start ca 14:25 channel 1 : Si upstream
 channel 2: SiC downstream
 400 V Bias Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
 position: x = 8y = 68
 |