Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 1 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data Text Attachments
  2   Sun May 10 13:43:49 2020 Christian Irmlersetup1Diamond + DSSD tracker       none      setup.jpg 
  4   Sun May 10 15:26:33 2020 Christian Irmleralignment1Diamond + DSSD tracker252.7nonenone EFE SID2none 75970 alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
 8x 
  5   Sun May 10 15:58:42 2020 Christian Irmleralignment2Diamond + DSSD tracker252.7nonenone EFE SID2none 42740 alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
 8x 
  100   Sun Jun 21 09:36:52 2020 Felix Ulrich-PurSilimond 800MeV 800V38Diamond + DSSD tracker800106020106dB   33035 800 MeV global run (tracking effciency)
setting4

 
 pct_dia_01_silimond_800V_beam_LocalHardware_02-000038_hitmap.png 
  101   Sun Jun 21 10:21:53 2020 Felix Ulrich-PurSilimond 800MeV 800V39Diamond + DSSD tracker800106020106dB   2498 800 MeV global run (tracking effciency)
setting4

 
  
  94   Sun Jun 21 06:12:08 2020 Felix Ulrich-PurSilimond 800MeV 500V32Diamond + DSSD tracker800106020106dB   24116 800 MeV global run (tracking effciency)
setting4
  
  103   Sun Jun 21 10:47:23 2020 Felix Ulrich-PurSilimond 800MeV 500V41Diamond + DSSD tracker800106020106dB   83304 800 MeV global run (tracking effciency)
setting4

 
  
  110   Sun Jun 21 14:17:34 2020 Felix Ulrich-PurSilimond 500V48DiamondNoise          500 V run after high flux irradiation

 
  
  93   Sun Jun 21 05:31:37 2020 Felix Ulrich-PurSilimond31Diamond + DSSD trackerNoise          local run   
  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             First testbeam with MPW2, Setup as depicted
in attachment 1,

Default beam setting EFE/SID0 252
 Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf 
  276   Sun Dec 6 13:59:35 2020 Christian IrmlerMPW2196W13_04252.7   1 SID0    Testrun to check number of hits per splill
--> ~5k hits per spill
  
  277   Sun Dec 6 15:37:05 2020 Christian IrmlerMPW2197W13_04252.7   1 SID0 HV = 80V10 spills HV = 80V

r0 c2
  
  278   Sun Dec 6 15:38:59 2020 Christian IrmlerMPW2198W13_04252.7   1 SID0 HV = 60V10 spills HV = 60V

r0 c2
  
  279   Sun Dec 6 15:41:31 2020 Christian IrmlerMPW2199W13_04252.7   1 SID0 HV = 40V10 spills HV = 40V

r0 c2
  
  281   Sun Dec 6 15:44:51 2020 Christian IrmlerMPW2200W13_04252.7   1 SID0 HV = during ramping10 spillsCrapHV = 

r0 c2
  
  282   Sun Dec 6 15:45:45 2020 Christian IrmlerMPW2201W13_04252.7   1 SID0 HV = 100V10 spills r0 c2   
  283   Sun Dec 6 15:53:12 2020 Christian IrmlerMPW2202W13_04252.7   1 SID0 HV off10 spills r0 c2

HV set to 0V, but KeithRC SW turned
SMU output off 
  
  284   Sun Dec 6 15:55:13 2020 Christian IrmlerMPW2203W13_04252.7   1 SID0 HV = 1V10 spills r0 c2

lowest Voltage, which could be
set with SMU outputs on.
  
  285   Sun Dec 6 15:57:28 2020 Christian IrmlerMPW2204W13_04252.7   1 SID0 HV = 20V10 spills r0 c2   
  286   Sun Dec 6 16:01:02 2020 Christian IrmlerMPW2205W13_04252.7   1 SID0 HV = 80V10 spills pixel scan, starting with r0 c0

stopped after r1 c5 due to synch
issues
  
ELOG V3.1.5-fc6679b