pixel scan, starting with r0 c7
stopped due to broken pipe
Caribou rebooted
First testbeam with MPW2, Setup as depicted in attachment 1,
Default beam setting EFE/SID0 252 MeV, released setting TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday!
local run
500 V run after high flux irradiation
800 MeV global run (tracking effciency) setting4
telescope shifted 6mm to the left (in beam direction)
alignment run DSSD HV = +/- 50V Dia HV = +/- 250V xml = pct_dia_01_silimond_beam_01-000001.xml
start: 15:00 stop: 15:56
alignment run DSSD HV = +/- 50V Dia HV = +/- 250V xml = pct_dia_01_silimond_beam_01-000001.xml after ~ 1h beam (pumping)
start: 15:58 stop: 16:26