Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 5 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energydown Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data Text Attachments
  9   Sun May 10 17:01:42 2020 Christian IrmlerCalibration Diamond + pCT-6 600V6Diamond + DSSD-pCT6252.7nonenone    none   pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 300V
  
  10   Sun May 10 17:14:00 2020 Christian IrmlerCalibration Diamond + pCT-6 300V7Diamond + DSSD-pCT6252.7nonenone    none   pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 150V
  
  11   Sun May 10 17:16:58 2020 Christian IrmlerCalibration Diamond 300V8Diamond252.7nonenone    none   Diamond only
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal
  
  12   Sun May 10 17:21:28 2020 Felix Ulrich-PurCalibration Diamond 400V9Diamond252.7nonenone    none   Diamond only
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal
  
  13   Sun May 10 17:38:55 2020 Felix Ulrich-PurCalibration Diamond+pCT6 400V10Diamond + DSSD-pCT6252.7nonenone    none   Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal
  
  14   Sun May 10 17:44:50 2020 Felix Ulrich-PurCalibration Diamond+pCT6 500V11Diamond + DSSD-pCT6252.7nonenone    none   Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal
  
  15   Sun May 10 18:13:10 2020 Felix Ulrich-PurBeam Diamond 300V13Diamond252.7nonenone EFE SID2none 124099 Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal
  
  16   Sun May 10 18:29:01 2020 Felix Ulrich-PurBeam Diamond 400V14Diamond252.7nonenone EFE SID2none 103304 Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal
  
  24   Sun May 10 22:04:51 2020 Christian IrmlerBeam+Diamond 500V22Diamond252.7nonenone EFE SID2none 221012 Diamond
Dia HV = +/- 250V

run taken instead of 800MeV -->
  
  25   Sun May 10 22:21:11 2020 Felix Ulrich-PurCalibration Tracker+Diamond 500V24Diamond + DSSD tracker252.7nonenone    none   Diamond+Tracker
Dia HV = +/- 250V

 
  
  104   Sun Jun 21 12:29:57 2020 Felix Ulrich-PurDiamond only 252.7MeV 700V42Diamond252.7   EFE SID2  113770 252.7 MeV global run

 

telescope shifted 6mm to the left
  
  105   Sun Jun 21 13:11:19 2020 Felix Ulrich-PurDiamond only 252.7MeV 500V43Diamond252.7   EFE SID2  101536 252.7 MeV global run

 

telescope shifted 6mm to the left
  
  107   Sun Jun 21 13:54:57 2020 Felix Ulrich-PurDiamond only 252.7 MeV 500V45Diamond252.7   EFE SID0    252.7 MeV 4MHz flux text no spill structure 
in current visible

 
  
  108   Sun Jun 21 13:57:57 2020 Felix Ulrich-PurDiamond only 252.7 MeV 500V46Diamond252.7  10       252.7 MeV 400MHz flux test: spill structure 
in current visible

nominal flux degrader 10, random
  
  109   Sun Jun 21 14:16:41 2020 Felix Ulrich-PurDiamond only 252.7 MeV 800V47Diamond252.7   EFE SID2  118671 252.7 MeV lobal run

 

telescope shifted 6mm to the left
  
  114   Sat Jul 4 04:00:31 2020 Felix Ulrich-PurEFE SID0 Energy measurement4Peakfinder252.7   yes SID0    2 spills per measurement point   
  115   Sat Jul 4 04:00:58 2020 Felix Ulrich-PurEFE SID2 Energy measurement5Peakfinder252.7   yes SID2    6 spills per point -> no signal measurable
(always 0)
  
  118   Sat Jul 4 04:04:09 2020 Felix Ulrich-PurEFE SID0 spot-size measurement8Lynx+RaMon+Octavius252.7   yes SID0    tested 90,60 and 30s exposure time of Lynx   
  125   Sat Jul 4 04:15:29 2020 Felix Ulrich-PurBeta+EFE spot-size measurement15Lynx+RaMon+Octavius252.7yes  yes      tested 180s exposure time of Lynx   
  132   Sat Jul 4 04:46:14 2020 Felix Ulrich-PurEFE SID2 spot-size measurement22Lynx+RaMon+Octavius252.7   yes SID2    tested 180s exposure time of Lynx, no signal
in Lynx or Octavius

 
  
ELOG V3.1.5-fc6679b