Sun May 10 17:01:42 2020, Christian Irmler, Calibration Diamond + pCT-6 600V, 6, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,
|
pCT-6 + diamond
DSSD HV = +/-50V
Dia HV = +/- 300V |
Sun May 10 17:14:00 2020, Christian Irmler, Calibration Diamond + pCT-6 300V, 7, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,
|
pCT-6 + diamond
DSSD HV = +/-50V
Dia HV = +/- 150V |
Sun May 10 17:16:58 2020, Christian Irmler, Calibration Diamond 300V, 8, Diamond, 252.7, none, none, , , , , none, , ,
|
Diamond only
Dia HV = +/- 150V
ADC, FIR, ped, noise, cal |
Sun May 10 17:21:28 2020, Felix Ulrich-Pur, Calibration Diamond 400V, 9, Diamond, 252.7, none, none, , , , , none, , ,
|
Diamond only
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
Sun May 10 17:38:55 2020, Felix Ulrich-Pur, Calibration Diamond+pCT6 400V, 10, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,
|
Diamond+pCT6
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
Sun May 10 17:44:50 2020, Felix Ulrich-Pur, Calibration Diamond+pCT6 500V, 11, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,
|
Diamond+pCT6
Dia HV = +/- 250V
ADC, FIR, ped, noise, cal |
Sun May 10 18:13:10 2020, Felix Ulrich-Pur, Beam Diamond 300V, 13, Diamond, 252.7, none, none, , EFE, , SID2, none, , 124099,
|
Diamond+pCT6
Dia HV = +/- 150V
ADC, FIR, ped, noise, cal |
Sun May 10 18:29:01 2020, Felix Ulrich-Pur, Beam Diamond 400V, 14, Diamond, 252.7, none, none, , EFE, , SID2, none, , 103304,
|
Diamond+pCT6
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
Sun May 10 22:04:51 2020, Christian Irmler, Beam+Diamond 500V, 22, Diamond, 252.7, none, none, , EFE, , SID2, none, , 221012,
|
Diamond
Dia HV = +/- 250V
run taken instead of 800MeV --> beam parameters for 800 were not prepared |
Sun May 10 22:21:11 2020, Felix Ulrich-Pur, Calibration Tracker+Diamond 500V, 24, Diamond + DSSD tracker, 252.7, none, none, , , , , none, , ,
|
Diamond+Tracker
Dia HV = +/- 250V
|
Sun Jun 21 12:29:57 2020, Felix Ulrich-Pur, Diamond only 252.7MeV 700V, 42, Diamond, 252.7, , , , EFE, , SID2, , , 113770,
|
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction) |
Sun Jun 21 13:11:19 2020, Felix Ulrich-Pur, Diamond only 252.7MeV 500V, 43, Diamond, 252.7, , , , EFE, , SID2, , , 101536,
|
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction) |
Sun Jun 21 13:54:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 45, Diamond, 252.7, , , , EFE, , SID0, , , ,
|
252.7 MeV 4MHz flux text no spill structure in current visible
telescope shifted 6mm to the left (in beam direction) |
Sun Jun 21 13:57:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 46, Diamond, 252.7, , , 10, , , , , , ,
|
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger
|
Sun Jun 21 14:16:41 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 800V, 47, Diamond, 252.7, , , , EFE, , SID2, , , 118671,
|
252.7 MeV lobal run
telescope shifted 6mm to the left (in beam direction) |
Sat Jul 4 04:00:31 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 4, Peakfinder, 252.7, , , , yes, , SID0, , , ,
|
2 spills per measurement point |
Sat Jul 4 04:00:58 2020, Felix Ulrich-Pur, EFE SID2 Energy measurement, 5, Peakfinder, 252.7, , , , yes, , SID2, , , ,
|
6 spills per point -> no signal measurable (always 0) |
Sat Jul 4 04:04:09 2020, Felix Ulrich-Pur, EFE SID0 spot-size measurement, 8, Lynx+RaMon+Octavius, 252.7, , , , yes, , SID0, , , ,
|
tested 90,60 and 30s exposure time of Lynx |
Sat Jul 4 04:15:29 2020, Felix Ulrich-Pur, Beta+EFE spot-size measurement, 15, Lynx+RaMon+Octavius, 252.7, yes, , , yes, , , , , ,
|
tested 180s exposure time of Lynx |
Sat Jul 4 04:46:14 2020, Felix Ulrich-Pur, EFE SID2 spot-size measurement, 22, Lynx+RaMon+Octavius, 252.7, , , , yes, , SID2, , , ,
|
tested 180s exposure time of Lynx, no signal in Lynx or Octavius
|
|