Start 23:56; Stop 00:19; PCT phase;
Linearity Messung Gain 300 10e5 rate, Qgroup +1V
Start 23:33; Stop 23:55; PCT phase;
Linearity Messung Gain 300 10e5 rate, Qgroup +0.5V
Start 22:49; Stop 23:32; PCT phase; beam interruption (approx. 15 min)
Linearity Messung Gain 300 10e5 rate
Start 22:27; Stop 22:47; PCT phase;
diamond only Dia HV = +/- 300V
pct_dia_01_diamond_600V_01-000005.xml
Setting 4
S9 did not converge run stopped
6 spills per point -> no signal measurable (always 0)
Start 09:48; TERA linearity
Linearity Messung Gain 400
Start 22:05; Stop 22:25; PCT phase;
Linearity Messung Gain 300
500 V run after high flux irradiation
Start 21:40; Stop 22:03; PCT phase;
Linearity Messung Gain 600 10e5 rate
252.7 MeV lobal run
telescope shifted 6mm to the left (in beam direction)
Start 21:18; Stop 21:38; PCT phase;