ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Beam Betatron |
Beam Chopper |
Beam Degrader |
Beam EFE |
Beam Orb |
Beam QuadScan |
PhantomType |
PhantomAngle |
Events |
Data |
9
|
Sun May 10 17:01:42 2020 |
Christian Irmler | Calibration Diamond + pCT-6 600V | 6 | Diamond + DSSD-pCT6 | 252.7 | none | none | | | | | none | | | |
pCT-6 + diamond
DSSD HV = +/-50V
Dia HV = +/- 300V
ADC, FIR, ped, noise, cal |
10
|
Sun May 10 17:14:00 2020 |
Christian Irmler | Calibration Diamond + pCT-6 300V | 7 | Diamond + DSSD-pCT6 | 252.7 | none | none | | | | | none | | | |
pCT-6 + diamond
DSSD HV = +/-50V
Dia HV = +/- 150V
ADC, FIR, ped, noise, cal |
11
|
Sun May 10 17:16:58 2020 |
Christian Irmler | Calibration Diamond 300V | 8 | Diamond | 252.7 | none | none | | | | | none | | | |
Diamond only
Dia HV = +/- 150V
ADC, FIR, ped, noise, cal |
12
|
Sun May 10 17:21:28 2020 |
Felix Ulrich-Pur | Calibration Diamond 400V | 9 | Diamond | 252.7 | none | none | | | | | none | | | |
Diamond only
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
13
|
Sun May 10 17:38:55 2020 |
Felix Ulrich-Pur | Calibration Diamond+pCT6 400V | 10 | Diamond + DSSD-pCT6 | 252.7 | none | none | | | | | none | | | |
Diamond+pCT6
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
14
|
Sun May 10 17:44:50 2020 |
Felix Ulrich-Pur | Calibration Diamond+pCT6 500V | 11 | Diamond + DSSD-pCT6 | 252.7 | none | none | | | | | none | | | |
Diamond+pCT6
Dia HV = +/- 250V
ADC, FIR, ped, noise, cal |
15
|
Sun May 10 18:13:10 2020 |
Felix Ulrich-Pur | Beam Diamond 300V | 13 | Diamond | 252.7 | none | none | | EFE | | SID2 | none | | 124099 | |
Diamond+pCT6
Dia HV = +/- 150V
ADC, FIR, ped, noise, cal |
16
|
Sun May 10 18:29:01 2020 |
Felix Ulrich-Pur | Beam Diamond 400V | 14 | Diamond | 252.7 | none | none | | EFE | | SID2 | none | | 103304 | |
Diamond+pCT6
Dia HV = +/- 200V
ADC, FIR, ped, noise, cal |
24
|
Sun May 10 22:04:51 2020 |
Christian Irmler | Beam+Diamond 500V | 22 | Diamond | 252.7 | none | none | | EFE | | SID2 | none | | 221012 | |
Diamond
Dia HV = +/- 250V
run taken instead of 800MeV --> beam parameters for 800 were not prepared |
25
|
Sun May 10 22:21:11 2020 |
Felix Ulrich-Pur | Calibration Tracker+Diamond 500V | 24 | Diamond + DSSD tracker | 252.7 | none | none | | | | | none | | | |
Diamond+Tracker
Dia HV = +/- 250V
|
104
|
Sun Jun 21 12:29:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7MeV 700V | 42 | Diamond | 252.7 | | | | EFE | | SID2 | | | 113770 | |
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction)
|
105
|
Sun Jun 21 13:11:19 2020 |
Felix Ulrich-Pur | Diamond only 252.7MeV 500V | 43 | Diamond | 252.7 | | | | EFE | | SID2 | | | 101536 | |
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction)
|
107
|
Sun Jun 21 13:54:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 500V | 45 | Diamond | 252.7 | | | | EFE | | SID0 | | | | |
252.7 MeV 4MHz flux text no spill structure in current visible
telescope shifted 6mm to the left (in beam direction)
|
108
|
Sun Jun 21 13:57:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 500V | 46 | Diamond | 252.7 | | | 10 | | | | | | | |
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger
telescope shifted 6mm to the left (in beam direction)
|
109
|
Sun Jun 21 14:16:41 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 800V | 47 | Diamond | 252.7 | | | | EFE | | SID2 | | | 118671 | |
252.7 MeV lobal run
telescope shifted 6mm to the left (in beam direction)
|
114
|
Sat Jul 4 04:00:31 2020 |
Felix Ulrich-Pur | EFE SID0 Energy measurement | 4 | Peakfinder | 252.7 | | | | yes | | SID0 | | | | |
2 spills per measurement point |
115
|
Sat Jul 4 04:00:58 2020 |
Felix Ulrich-Pur | EFE SID2 Energy measurement | 5 | Peakfinder | 252.7 | | | | yes | | SID2 | | | | |
6 spills per point -> no signal measurable (always 0) |
118
|
Sat Jul 4 04:04:09 2020 |
Felix Ulrich-Pur | EFE SID0 spot-size measurement | 8 | Lynx+RaMon+Octavius | 252.7 | | | | yes | | SID0 | | | | |
tested 90,60 and 30s exposure time of Lynx |
125
|
Sat Jul 4 04:15:29 2020 |
Felix Ulrich-Pur | Beta+EFE spot-size measurement | 15 | Lynx+RaMon+Octavius | 252.7 | yes | | | yes | | | | | | |
tested 180s exposure time of Lynx |
132
|
Sat Jul 4 04:46:14 2020 |
Felix Ulrich-Pur | EFE SID2 spot-size measurement | 22 | Lynx+RaMon+Octavius | 252.7 | | | | yes | | SID2 | | | | |
tested 180s exposure time of Lynx, no signal in Lynx or Octavius
|