Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 4 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energydown Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  17   Sun May 10 18:34:18 2020 Felix Ulrich-PurBeam Diamond 400V15Diamond62.4nonenone EFE SID2none 100868 

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  18   Sun May 10 18:55:45 2020 Felix Ulrich-PurBeam Diamond 300V16Diamond62.4nonenone EFE SID2none 104515 

Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  19   Sun May 10 19:27:52 2020 Felix Ulrich-PurBeam Diamond 600V17Diamond62.4nonenone EFE SID2none 44667 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

unterbrochen, da TLU-ERROR

  20   Sun May 10 19:28:36 2020 Felix Ulrich-PurBeam Diamond 600V18Diamond62.4nonenone EFE SID2none 62250 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

PARTII

  21   Sun May 10 19:39:34 2020 Felix Ulrich-PurBeam Diamond+pCT6 500V19Diamond + DSSD-pCT662.4nonenone EFE SID2none 101031 

Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Attachment 1: 01-000019.root-cogLocations_5.1.1.0-Empirics.png
01-000019.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000019.root-cogLocations_5.1.1.1-Empirics.png
01-000019.root-cogLocations_5.1.1.1-Empirics.png
  69   Sat Jun 13 04:42:06 2020 Felix Ulrich-PurLinearity measurement TERA 62.4 gain 20044TERA-Cal62.4BETA  EFE  none 200000 

Linearity Messung Gain 200 10e5 rate

  70   Sat Jun 13 04:44:03 2020 Felix Ulrich-PurLinearity measurement TERA 62.4 gain 30045TERA-Cal62.4BETA  EFE  none 200000 

Linearity Messung Gain 300 10e5 rate

  71   Sat Jun 13 04:52:48 2020 Felix Ulrich-PurLinearity measurement TERA 62.4 gain 40046TERA-Cal62.4BETA  EFE  none 200000 

Linearity Messung Gain 400 10e5 rate

  72   Sat Jun 13 04:52:59 2020 Felix Ulrich-PurLinearity measurement TERA 62.4 gain 60047TERA-Cal62.4BETA  EFE  none 200000 

Linearity Messung Gain 600 10e5 rate

  106   Sun Jun 21 13:11:37 2020 Felix Ulrich-PurDiamond only 62.4MeV 700V44Diamond62.4   EFE SID2  100528 

62.4MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

  113   Sat Jul 4 04:00:05 2020 Felix Ulrich-PurEFE SID0 Energy measurement3Peakfinder62.4   yes SID0    

1 spills per measurement point

  116   Sat Jul 4 04:01:29 2020 Felix Ulrich-PurEFE SID2 Energy measurement6Peakfinder62.4   yes SID2    

6 spills per point -> no signal measurable (always 0)

  117   Sat Jul 4 04:02:17 2020 Felix Ulrich-PurEFE SID0 spot-size measurement7Lynx+RaMon+Octavius+Film62.4   yes SID0    

11 min irradiation of film (spot visible)

tested 180,90 and 60s exposure time of Lynx (saturated at >=90)

  124   Sat Jul 4 04:06:58 2020 Felix Ulrich-PurBeta+EFE spot-size measurement14Lynx+RaMon+Octavius+Film62.4yes  yes      

tested 120+180s exposure time of Lynx

  131   Sat Jul 4 04:44:19 2020 Felix Ulrich-PurEFE SID2 spot-size measurement21Lynx+RaMon+Octavius+Film62.4   yes SID2    

tested 180s exposure time of Lynx, no signal in Lynx or Octavius

35min irradiation of film (no signal)

  4   Sun May 10 15:26:33 2020 Christian Irmleralignment1Diamond + DSSD tracker252.7nonenone EFE SID2none 75970 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

start: 15:00
stop: 15:56

Attachment 1: 01-000001.root-cogLocations_5.1.1.0-Empirics.png
01-000001.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000001.root-cogLocations_5.1.1.1-Empirics.png
01-000001.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000001.root-cogLocations_5.1.2.0-Empirics.png
01-000001.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000001.root-cogLocations_5.1.2.1-Empirics.png
01-000001.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000001.root-cogLocations_5.1.3.0-Empirics.png
01-000001.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000001.root-cogLocations_5.1.3.1-Empirics.png
01-000001.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000001.root-cogLocations_5.1.4.0-Empirics.png
01-000001.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000001.root-cogLocations_5.1.4.1-Empirics.png
01-000001.root-cogLocations_5.1.4.1-Empirics.png
  5   Sun May 10 15:58:42 2020 Christian Irmleralignment2Diamond + DSSD tracker252.7nonenone EFE SID2none 42740 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

after ~ 1h beam (pumping)

start: 15:58
stop:  16:26

Attachment 1: 01-000002.root-cogLocations_5.1.1.0-Empirics.png
01-000002.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000002.root-cogLocations_5.1.1.1-Empirics.png
01-000002.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000002.root-cogLocations_5.1.2.0-Empirics.png
01-000002.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000002.root-cogLocations_5.1.2.1-Empirics.png
01-000002.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000002.root-cogLocations_5.1.3.0-Empirics.png
01-000002.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000002.root-cogLocations_5.1.3.1-Empirics.png
01-000002.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000002.root-cogLocations_5.1.4.0-Empirics.png
01-000002.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000002.root-cogLocations_5.1.4.1-Empirics.png
01-000002.root-cogLocations_5.1.4.1-Empirics.png
  6   Sun May 10 16:44:46 2020 Christian IrmlerCalibration Diamond 500V3Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  7   Sun May 10 16:47:10 2020 Christian IrmlerCalibration Diamond 600V4Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  8   Sun May 10 16:47:49 2020 Christian IrmlerBeam Diamond 600V5Diamond252.7nonenone EFE SID2none 103286 

diamond only
Dia HV = +/- 300V

pct_dia_01_diamond_600V_01-000005.xml

ELOG V3.1.5-fc6679b