Setting 4
repeated 300, because of SW error in previous run
repeated 200, because of SW error in previous run
few slices did not converge -> adapt range setting
few slices did not converge -> adapted range setting
q9 and p3 did not converge-->choose mean voltage of group
1Setting 4
used same voltages as calibrated with Sr-90 (MPV 300)
800 MeV global run (tracking effciency) setting4
telescope shifted 6mm to the left (in beam direction)
4 strips on n- side started to getted really noisy (408,409,483,484)
strips are not noisy
800 MeV, "Setting 4"
Timeout stop
Calibration
Start 06:58; "Setting 4", Calibration