Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 15 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Numberdown DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data Text Attachments
  120   Sat Jul 4 04:05:13 2020 Felix Ulrich-PurEFE SID0 spot-size measurement10Lynx+RaMon+Octavius145.4   yes SID0    tested 60 and 30s exposure time of Lynx   
  149   Sun Sep 20 09:14:06 2020 Alexander Burker 10           CrapTiming in Tracker seems to be off

 
  
  164   Sat Oct 10 11:18:06 2020 Manuel Christanell2020-10-1010TERA+Tracker252.71  1      Start 11:03   
  2   Sun May 10 13:43:49 2020 Christian Irmlersetup1Diamond + DSSD tracker       none      setup.jpg 
  3   Sun May 10 14:51:12 2020 Christian IrmlerCalibration Runs1Diamond + DSSD trackerNoise      none   ADC delay, FIR, ped, noise,cal with DSSD
tracker + diamond
DSSD HV= +/- 50V
  
  4   Sun May 10 15:26:33 2020 Christian Irmleralignment1Diamond + DSSD tracker252.7nonenone EFE SID2none 75970 alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
 8x 
  26   Fri Jun 12 23:10:40 2020 Felix Ulrich-PurCalibration TERA MPV 2001TERA-Cal800106020106dB none   Setting 4

was stopped, cause timout setting
was not adjusted to spill structure
  
  111   Sat Jul 4 03:58:14 2020 Felix Ulrich-PurEFE SID0 Energy measurement1Peakfinder100.4   yes SID0    3 spills per measurement point   
  140   Sun Sep 20 06:09:28 2020 Alexander Burker2020-09-201TERA-Cal800      none   800 MeV, "Setting 4"

 
  
  157   Sat Oct 10 09:39:02 2020 Alexander Burker2020-10-101TERA-Cal           Start 06:25; Pedestal run

 
  
  Draft   Fri May 8 15:17:39 2020 Felix Ulrich-Pur  DSSD-TrackerNoise              
  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             First testbeam with MPW2, Setup as depicted
in attachment 1,

Default beam setting EFE/SID0 252
 Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf 
ELOG V3.1.5-fc6679b