Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 15 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energydown Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data Text Attachments
  167   Sat Oct 10 11:22:12 2020 Manuel Christanell2020-10-1013TERA+Tracker           Start 11:09; without beam; no trigger   
  168   Sat Oct 10 11:23:25 2020 Manuel Christanell2020-10-1014TERA+Tracker           Start 11:10; without beam; no trigger   
  169   Sat Oct 10 11:25:38 2020 Manuel Christanell2020-10-1015TERA+Tracker           Start 11:13; without beam; no trigger   
  170   Sat Oct 10 11:41:12 2020 Manuel Christanell2020-10-1016TERA+Tracker           Test; loose connection kalorimeter   
  171   Sat Oct 10 11:43:20 2020 Manuel Christanell2020-10-1017TERA+Tracker           Test; loose connection kalorimeter   
  175   Sat Oct 10 12:58:48 2020 Manuel Christanell2020-10-1021TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  176   Sat Oct 10 12:59:53 2020 Manuel Christanell2020-10-1022TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  177   Sat Oct 10 13:00:05 2020 Manuel Christanell2020-10-1023TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  178   Sat Oct 10 13:00:18 2020 Manuel Christanell2020-10-1024TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  179   Sat Oct 10 13:00:29 2020 Manuel Christanell2020-10-1025TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  180   Sat Oct 10 13:00:41 2020 Manuel Christanell2020-10-1026TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             First testbeam with MPW2, Setup as depicted
in attachment 1,

Default beam setting EFE/SID0 252
 Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf 
ELOG V3.1.5-fc6679b