Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 15 of 15  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Eventsdown Data Text Attachments
  176   Sat Oct 10 12:59:53 2020 Manuel Christanell2020-10-1022TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  177   Sat Oct 10 13:00:05 2020 Manuel Christanell2020-10-1023TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  178   Sat Oct 10 13:00:18 2020 Manuel Christanell2020-10-1024TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  179   Sat Oct 10 13:00:29 2020 Manuel Christanell2020-10-1025TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  180   Sat Oct 10 13:00:41 2020 Manuel Christanell2020-10-1026TERA+Tracker           without Beam; Tracker no trigger; Rotation
table problems
  
  263   Sat Nov 21 16:45:40 2020 Patrick Sieberer2020-11-2134DSSD-Tracker80010602010  none   tracker local run   
  264   Sat Nov 21 16:47:54 2020 Patrick Sieberer2020-11-2135RaMon80010602010  none   trigger counting   
  265   Sat Nov 21 16:48:46 2020 Patrick Sieberer2020-11-2136RaMon80010602010  none   trigger counting

division oscilloscpe: 1V 400ns
 Screenshot_from_2020-11-21_17-38-43.png 
  266   Sat Nov 21 16:49:10 2020 Patrick Sieberer2020-11-2137DSSD-Tracker80010602010  none   config test   
  273   Sat Nov 21 20:43:36 2020 Patrick Sieberer2020-11-2144Diamond + DSSD tracker80010602010  none  Unknownlocal run, (with switched APV channels)

Due to invers bias, p- and n-side
of diamond are also flipped!
  
  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             First testbeam with MPW2, Setup as depicted
in attachment 1,

Default beam setting EFE/SID0 252
 Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf 
  276   Sun Dec 6 13:59:35 2020 Christian IrmlerMPW2196W13_04252.7   1 SID0    Testrun to check number of hits per splill
--> ~5k hits per spill
  
ELOG V3.1.5-fc6679b