Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 15 of 15  Not logged in ELOG logo
Entry  Sat Jul 4 04:05:13 2020, Felix Ulrich-Pur, EFE SID0 spot-size measurement, 10, Lynx+RaMon+Octavius, 145.4, , , , yes, , SID0, , , ,  

tested 60 and 30s exposure time of Lynx

Entry  Sun Sep 20 09:14:06 2020, Alexander Burker, , 10, , , , , , , , , , , , Crap 

Timing in Tracker seems to be off

 

Entry  Sat Oct 10 11:18:06 2020, Manuel Christanell, 2020-10-10, 10, TERA+Tracker, 252.7, 1, , , 1, , , , , ,  

Start 11:03

Entry  Sun May 10 13:43:49 2020, Christian Irmler, setup, 1, Diamond + DSSD tracker, , , , , , , , none, , ,  setup.jpg
 
Entry  Sun May 10 14:51:12 2020, Christian Irmler, Calibration Runs, 1, Diamond + DSSD tracker, Noise, , , , , , , none, , ,  

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

Entry  Sun May 10 15:26:33 2020, Christian Irmler, alignment, 1, Diamond + DSSD tracker, 252.7, none, none, , EFE, , SID2, none, , 75970,  8x

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

start: 15:00
stop: 15:56

Entry  Fri Jun 12 23:10:40 2020, Felix Ulrich-Pur, Calibration TERA MPV 200, 1, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  

Setting 4

was stopped, cause timout setting was not adjusted to spill structure

Entry  Sat Jul 4 03:58:14 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 1, Peakfinder, 100.4, , , , yes, , SID0, , , ,  

3 spills per measurement point

Entry  Sun Sep 20 06:09:28 2020, Alexander Burker, 2020-09-20, 1, TERA-Cal, 800, , , , , , , none, , ,  

800 MeV, "Setting 4"

 

Entry  Sat Oct 10 09:39:02 2020, Alexander Burker, 2020-10-10, 1, TERA-Cal, , , , , , , , , , ,  

Start 06:25; Pedestal run

 

Entry  Fri May 8 15:17:39 2020, Felix Ulrich-Pur, , , DSSD-Tracker, Noise, , , , , , , , , ,  
 
Entry  Sun Dec 6 12:52:17 2020, Christian Irmler, MPW2 setup and configuration, , , , , , , , , , , , ,  Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf

First testbeam with MPW2, Setup as depicted in attachment 1,

Default beam setting EFE/SID0 252 MeV, released setting 

TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday! 

 

ELOG V3.1.5-fc6679b