Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 14 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  32   Sat Jun 13 00:54:47 2020 Felix Ulrich-PurCalibration TERA MPV 3007TERA-Cal800106020106dB none   

Setting 4

repeated 300, because of SW error in previous run

 

  31   Sat Jun 13 00:34:32 2020 Felix Ulrich-PurCalibration TERA MPV 4006TERA-Cal800106020106dB none   

Setting 4

 

  30   Sat Jun 13 00:29:22 2020 Felix Ulrich-PurCalibration TERA MPV 4005TERA-Cal800106020106dB none   

Setting 4

S9 did not converge run stopped

 

  29   Sat Jun 13 00:14:44 2020 Felix Ulrich-PurCalibration TERA MPV 4004TERA-Cal800106020106dB none   

Setting 4

stopped because one slice could not be calibrated due to SW error

  28   Sat Jun 13 00:01:43 2020 Felix Ulrich-PurCalibration TERA MPV 3003TERA-Cal800106020106dB none   

Setting 4

 

  27   Fri Jun 12 23:47:07 2020 Felix Ulrich-PurCalibration TERA MPV 2002TERA-Cal800106020106dB none   

Setting 4

slice R1 did not converge therofor 9 steps

  26   Fri Jun 12 23:10:40 2020 Felix Ulrich-PurCalibration TERA MPV 2001TERA-Cal800106020106dB none   

Setting 4

was stopped, cause timout setting was not adjusted to spill structure

  25   Sun May 10 22:21:11 2020 Felix Ulrich-PurCalibration Tracker+Diamond 500V24Diamond + DSSD tracker252.7nonenone    none   

Diamond+Tracker
Dia HV = +/- 250V

 

  24   Sun May 10 22:04:51 2020 Christian IrmlerBeam+Diamond 500V22Diamond252.7nonenone EFE SID2none 221012 

Diamond
Dia HV = +/- 250V

run taken instead of 800MeV --> beam parameters for 800 were not prepared

  23   Sun May 10 20:41:43 2020 Felix Ulrich-PurBeam+Diamond 500V21Diamond194.3nonenone EFE SID2none 150960 

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  22   Sun May 10 20:26:25 2020 Felix Ulrich-PurBeam+Diamond 500V20Diamond100.4nonenone EFE SID2none 103032 

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  21   Sun May 10 19:39:34 2020 Felix Ulrich-PurBeam Diamond+pCT6 500V19Diamond + DSSD-pCT662.4nonenone EFE SID2none 101031 

Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Attachment 1: 01-000019.root-cogLocations_5.1.1.0-Empirics.png
01-000019.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000019.root-cogLocations_5.1.1.1-Empirics.png
01-000019.root-cogLocations_5.1.1.1-Empirics.png
  20   Sun May 10 19:28:36 2020 Felix Ulrich-PurBeam Diamond 600V18Diamond62.4nonenone EFE SID2none 62250 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

PARTII

  19   Sun May 10 19:27:52 2020 Felix Ulrich-PurBeam Diamond 600V17Diamond62.4nonenone EFE SID2none 44667 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

unterbrochen, da TLU-ERROR

  18   Sun May 10 18:55:45 2020 Felix Ulrich-PurBeam Diamond 300V16Diamond62.4nonenone EFE SID2none 104515 

Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  17   Sun May 10 18:34:18 2020 Felix Ulrich-PurBeam Diamond 400V15Diamond62.4nonenone EFE SID2none 100868 

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  16   Sun May 10 18:29:01 2020 Felix Ulrich-PurBeam Diamond 400V14Diamond252.7nonenone EFE SID2none 103304 

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  15   Sun May 10 18:13:10 2020 Felix Ulrich-PurBeam Diamond 300V13Diamond252.7nonenone EFE SID2none 124099 

Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  14   Sun May 10 17:44:50 2020 Felix Ulrich-PurCalibration Diamond+pCT6 500V11Diamond + DSSD-pCT6252.7nonenone    none   

Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  13   Sun May 10 17:38:55 2020 Felix Ulrich-PurCalibration Diamond+pCT6 400V10Diamond + DSSD-pCT6252.7nonenone    none   

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

ELOG V3.1.5-fc6679b