Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 14 of 15  Not logged in ELOG logo
Entry  Sun May 10 20:26:25 2020, Felix Ulrich-Pur, Beam+Diamond 500V, 20, Diamond, 100.4, none, none, , EFE, , SID2, none, , 103032,  

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 20:41:43 2020, Felix Ulrich-Pur, Beam+Diamond 500V, 21, Diamond, 194.3, none, none, , EFE, , SID2, none, , 150960,  

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 22:04:51 2020, Christian Irmler, Beam+Diamond 500V, 22, Diamond, 252.7, none, none, , EFE, , SID2, none, , 221012,  

Diamond
Dia HV = +/- 250V

run taken instead of 800MeV --> beam parameters for 800 were not prepared

Entry  Fri Jun 19 19:22:10 2020, Felix Ulrich-Pur, Calibration Diamond,Silimond,pCT6+Diamand, 30, Diamond, , , , , , , , , , ,  

300V-800V in 100V steps

xml files:

/mnt/data/xmls/local/pct_dia_01_diamond_800V_02-000030.xml
/mnt/data/xmls/global/pct_dia_01_diamond_800V_beam_02-000030.xml

all calibration files

800 is only example replace with according voltage

Entry  Sun Jun 21 07:53:56 2020, Felix Ulrich-Pur, Diamond only 800MeV 500V, 33, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 109363,  

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

Entry  Sun Jun 21 07:54:38 2020, Felix Ulrich-Pur, Diamond only 800MeV 600V, 34, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 101831,  

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

Entry  Sun Jun 21 08:15:13 2020, Felix Ulrich-Pur, Diamond only 800MeV 700V, 35, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 101522,  pct_dia_01_diamond_700V_beam_LocalHardware_02-000035_hitmap_n.png

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

 

4 strips on n- side started to getted really noisy (408,409,483,484)

Entry  Sun Jun 21 08:43:23 2020, Felix Ulrich-Pur, Diamond only 800MeV 400V, 36, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 101680,  

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

strips are not noisy

Entry  Sun Jun 21 09:11:38 2020, Felix Ulrich-Pur, Diamond only 800MeV 300V, 37, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 116365,  

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 10:22:37 2020, Felix Ulrich-Pur, Diamond only 800MeV 800V, 40, Diamond, 800, 10, 60, 20, 10, 6dB, , , , 108625,  

800 MeV global run (tracking effciency)
setting4

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 12:29:57 2020, Felix Ulrich-Pur, Diamond only 252.7MeV 700V, 42, Diamond, 252.7, , , , EFE, , SID2, , , 113770,  

252.7 MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 13:11:19 2020, Felix Ulrich-Pur, Diamond only 252.7MeV 500V, 43, Diamond, 252.7, , , , EFE, , SID2, , , 101536,  

252.7 MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 13:11:37 2020, Felix Ulrich-Pur, Diamond only 62.4MeV 700V, 44, Diamond, 62.4, , , , EFE, , SID2, , , 100528,  

62.4MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 13:54:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 45, Diamond, 252.7, , , , EFE, , SID0, , , ,  

252.7 MeV 4MHz flux text no spill structure  in current visible

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 13:57:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 46, Diamond, 252.7, , , 10, , , , , , ,  

252.7 MeV 400MHz flux test: spill structure  in current visible

nominal flux degrader 10, random trigger

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 14:16:41 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 800V, 47, Diamond, 252.7, , , , EFE, , SID2, , , 118671,  

252.7 MeV lobal run

 

telescope shifted 6mm to the left (in beam direction)

 

Entry  Sun Jun 21 14:17:34 2020, Felix Ulrich-Pur, Silimond 500V, 48, Diamond, Noise, , , , , , , , , ,  

500 V run after high flux irradiation

 

Entry  Fri May 8 15:17:39 2020, Felix Ulrich-Pur, , , DSSD-Tracker, Noise, , , , , , , , , ,  
 
Entry  Sun Sep 20 07:39:31 2020, Alexander Burker, 2020-09-20, 7, DSSD-Tracker, 252.7, 1, , , 1, , , none, , , Crap 
 
Entry  Sun Sep 20 08:39:17 2020, Alexander Burker, 2020-09-20, 8, DSSD-Tracker, 252.7, 1, , , 1, , , none, , , Crap 
 
ELOG V3.1.5-fc6679b